20
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
Key:
1 - System draining valve
2 - 3-bar safety valve drain fitting signal
3 - DHW heat exchanger
4 - Gas valve
5 - Domestic hot water probe
6 - D.H.W. flow rate meter
7 - D.H.W. inlet probe
8 - D.H.W. flow-rate regulator
9
- Condensate drain trap
1
0
- System expansion vessel
11 - Air / gas mixer
12 - Flow probe
13 - Manual air vent valve
14 - Ignition / detection electrode
15 - Flue probe
16 - Sample points (air A) - (flue gas F)
17 - Burner cover
18 - Safety flow probe
1
9
- Condensation module
2
0
- Fan
21 - Return probe
22 - System pressure switch
23 - Vent valve
24 - Boiler circulator pump
25 - 3 bar safety valve
26 - By-pass
27 - 3-way valve (motorised)
28 - System filling valve
1.28 KITS AVAILABLE ON REQUEST.
•
System shut-off valve kits with or without
inspection filter (on request). The boiler is
designed for installation of system interception
cocks to be placed on flow and return pipes
of the connection assembly. This kit is very
useful for maintenance because it allows to
empty just the boiler without having to empty
the entire system. Moreover, the version with
filter preserves the functioning characteristics
of the boiler thanks to its inspectionable filter.
•
Polyphosphate dispenser kit (on request). The
polyphosphate dispenser reduces the forma-
tion of lime-scale and preserves the original
heat exchange and domestic hot water pro-
duction conditions. The boiler is prepared for
application of the polyphosphate dispenser kit.
•
Relay board (on request). The boiler is prepared
for the installation of a relay card that allows
to increase the features of the appliance and
therefore functioning possibilities.
•
Cover kit (on request). If installed outdoors in a
partially protected place with direct air intake,it
is compulsory to mount the appropriate top
protection cover for the correct functioning
of the boiler and to protect it from adverse
weather conditions.
•
Cycloidal filter kit (on request). The magnetic
cycloidal filter is able to detect the ferrous resi-
dues present in the system's water. Thanks to
the two cocks in the kit, it facilitates mainte-
nance by cleaning the filter without having to
empty the circuit.
The above-mentioned kits are supplied complete
with instructions for assembly and use.
1.2
7
BOILER COMPONENTS.
Содержание Victrix Maior 28 TT 1 ErP
Страница 1: ...VICTRIX MAIOR 28 35 TT 1 ERP IE Instruction and recommendation booklet 1 038659ENG...
Страница 2: ......
Страница 49: ...49...
Страница 50: ...50...
Страница 51: ...51...