D
x
Telemetry System
Manual Vers. 2.7
72
/
92
The strands should be soldered as flat as possible to the copper band. Sensor cables and
connection cables should not cross. Wrap the secondary coil with 3 layers of heat-
resistant adhesive tape to prevent overheating.
For measurements on high speed or high temperature shafts, CAEMAX offers special
solutions (half shells, special casings, etc.)
For further questions and instructions concerning your individual situation, please contact
CAEMAX support.
9. Apply secondary layer of heat resistant tape.
10.
Now connect the SCT to the secondary coil (see connecting diagram in section 2.2).
Therefore, use the connections designated for inductive power supply.
Figure 42: cross-section of secondary coil for inductive power supply
Содержание CAEMAX DX
Страница 31: ...Dx Telemetry System Manual Vers 2 7 31 92 Figure 20 Strain gauge channel configuration...
Страница 44: ...Dx Telemetry System Manual Vers 2 7 44 92 Menu tree continued...
Страница 84: ...Dx Telemetry System Manual Vers 2 7 84 92 10 Questions Answers 10 1 Inductive Power Supply Troubleshooting...
Страница 85: ...Dx Telemetry System Manual Vers 2 7 85 92...
Страница 86: ...Dx Telemetry System Manual Vers 2 7 86 92...