NEXIO AMP
Hardware Installation and User Guide
33
Confirming
Connection to
Additional Systems
The
LLM
enables you to confirm that NEXIO AMP is connected to additional systems by
viewing information in the Nodes area.
Figure 3-8
LLM Main Window
To confirm connection to additional systems
1
In the
Nodes
pane, confirm that the video server that you are currently logged on to and any other
active nodes are displayed.
If you are connected via a Media Host architecture you will only see your own node and not
the rest of the nodes in the system.
2
In the
Logical Disks
pane, confirm that logical disk D and any other volumes in your SAN are
displayed.
Verifying Audio
and Video I/O
Connections
Verify the signal routing by checking the installation of your cables. Confirm that all audio
and video I/O cables are connected properly and securely.
Содержание Nexio AMP NX3601 HDX
Страница 54: ...Chapter 6 Troubleshooting 54...