background image

1.4  Safety instructions for this device 

These installation and operating instructions are an integral part of the device 
and  must  be  forwarded  to  the  responsible  departments  "Goods  inward, 
Transport, Installation, Commissioning and Maintenance". They must be kept in 
such a way that the technical staff have access to these documents at all times. 
If  the  device  is  passed  on  to  a  third  party,  these  installation  and  operating 

 

instructions must also be included in the national language of the third party. 

Avoid  shocks  and  hard  contact  during  transport,  as  this  can  lead  to  damage.  During 
intermediate storage, the device must be kept dry and secured against damage. 

When  servicing  the  unit,  make  sure  to  use  sharp-edged  internal  parts  and  avoid  shards  of 
broken  glass.  There  is  a  risk  of  cutting  hands  and  arms!  Always  wear  work  gloves  when 
changing packing, valve seat and valve plug. 

When  returning  goods  to  IGEMA  GmbH,  the  applicable  safety  and  environmental  laws 
according  to  GGVSEB  [German  ordinance  on  the  national  and  international  carriage  of 
dangerous goods by road, rail, and inland waterways] must always be observed. If there are 
any risks to health or the environment due to residues or the device has a mechanical defect 
this must be indicated when returning the device and the necessary precautionary measures 
must be taken. If the returned goods are devices that have come into contact with or contain 
hazardous substances, a safety data sheet must be enclosed, and the goods must be clearly 
marked.  In  addition,  the  hazardous  substance  must  be  reported  to  the  logistics  service 
provider. 

1.5  Exclusion of liability 

IGEMA  GmbH  Measuring  and  control  technology  will  assume  no  liability  if  the  above 
regulations, instructions and safety precautions are not observed and followed. If they are not 
expressly listed in the installation and operating instructions, changes to an IGEMA device are 
carried out at the risk of the user. 

 

2.  Contents of the packaging 

1.  Sample cooler 

2.  Installation and maintenance instruction 

 

 

 

Caution 

Содержание IGEMA SC32-SC132

Страница 1: ...Edition 03 2021 D 11 B 53616 EN 00 Installation and maintenance instruction IGEMA SC32 SC132 Sample cooler...

Страница 2: ...e Steam is our passion and we offer you the entire programme for the safe and economic operation of your plants especially in the steam and condensate sector Please read the installation and operating...

Страница 3: ...5 Exclusion of liability 8 2 Contents of the packaging 8 3 General 9 3 1 Note 9 3 2 General Safety Instructions 9 4 Transport and Storage 10 4 1 Safety instruction 10 5 Installation 11 5 1 Safety Ins...

Страница 4: ...4 Table of contents cont 7 Maintenance 14 7 1 Limiting Conditions 14 8 Products returning 15 8 1 Safety Instructions 15 9 Loss of warranty 15...

Страница 5: ...bove tasks IGEMA GmbH accepts no liability for damage to property or personal injury caused by unqualified persons or by failure to observe these installation and operating instructions If no sufficie...

Страница 6: ...The maximum values of the pressure and temperature range of the device must be checked before installation If the maximum allowable operating values of the device are lower than those of the system on...

Страница 7: ...been depressurised and that the pressure has been safely reduced to atmospheric pressure In principle no system should be regarded as unpressurized even if indicated by pressure measuring devices suc...

Страница 8: ...bH the applicable safety and environmental laws according to GGVSEB German ordinance on the national and international carriage of dangerous goods by road rail and inland waterways must always be obse...

Страница 9: ...solve with the help of this instructions please contact the supplier or the manufacturer The manufacturer reserves the right to change the design and material of this product without notice 3 2 Gener...

Страница 10: ...rotective measures against dirt Correct installation of the equipment is full responsibility of the contractor Sample coolers are designed to be applied in places protected from exposure to weather We...

Страница 11: ...ior to install check that the product is suitable for the intended application materials and pressure temperature ratings Before installing remove plastic covers placed on flanges or connection ends T...

Страница 12: ...12 5 4 Dimensions Pos Description Sample cooler 1 Sample intake 2 Cooling water intake 2a Colling water valve 3 Draining connection 4 Funnel to take a measuring jug 5 Sample outlet 5a Thermometer unit...

Страница 13: ...wing must be checked All works are completed The sample cooler is correctly installed All the necessary safety devices have been installed At start up the presence of small particles in the fluid dirt...

Страница 14: ...ly after a small period of time in order to condense or cool the remaining steam inside the sample cooler 6 3 Periodical checking 24 hours after the start up it is recommended to check the pipe connec...

Страница 15: ...bstances identified as hazardous or potentially hazardous must be provided with the information mentioned above 9 Loss of warranty LOSS OF WARRANTY Total or partial disregard of above instructions inv...

Страница 16: ...16 Antwerpener Str 1 Fon 49 2501 92424 0 48163 M nster Fax 49 2501 92424 99 Deutschland info igema com www igema com IGEMA GmbH...

Отзывы: