6.2  Procedure to take boiler samples 

1. 

The cooling water stop valve (3) and the sample needle valve (2) should be closed. 

2. 

Open the cooling water valve slowly in order to avoid water hammer damaging, until the 
input pressure reaches its limit. 

3. 

Open the needle valve slowly so that flashing does not occur. Allow to run approximately 
10 seconds until fresh sample is drawn. 

4. 

Adjust the sample outlet temperature (if necessary), by regulating the sample needle valve 
and the water valve. 

5. 

Make sure that there is an adequate equipment to collect the sample in place. 

6. 

After the sample collection, close first the sample valve and then the water valve but only 
after a small period of time in order to condense or cool the remaining steam inside the 
sample cooler. 

6.3  Periodical checking 

 

24 hours after the start up, it is recommended to check the pipe connections for leaks and 
retighten the connections if necessary. 
 

7.  Maintenance 

 

The sample cooler don’t need any specific type of maintenance. Regular inspection may 
be recommended by local authorities according to specific or general pipe and/or vessels 
assembly procedures. 

 

For further information refer to relevant SC brochure or consult our sales office. 

 

When  reassembling  make  sure  that  all  gasket  faces  are  clean  and  always  use  a  new 
gasket. 

7.1  Limiting Conditions 

 
 
 
 
 
 
 
 
 
 

Minimum operating temperature: -10ºC 

Design code: Igema - Merkblatt 

 

 

LIMITING CONDITIONS

 

 

BODY

 

COIL

 

Model

 

Pressure 

 bar

 

Related  

Temp. °C

 

Pressure 

bar

 

Related 

Temp. °C

 

 

 

 

SC32 - 
SC132 

20 

120 

110 

400 

90 

450 

Содержание IGEMA SC32-SC132

Страница 1: ...Edition 03 2021 D 11 B 53616 EN 00 Installation and maintenance instruction IGEMA SC32 SC132 Sample cooler...

Страница 2: ...e Steam is our passion and we offer you the entire programme for the safe and economic operation of your plants especially in the steam and condensate sector Please read the installation and operating...

Страница 3: ...5 Exclusion of liability 8 2 Contents of the packaging 8 3 General 9 3 1 Note 9 3 2 General Safety Instructions 9 4 Transport and Storage 10 4 1 Safety instruction 10 5 Installation 11 5 1 Safety Ins...

Страница 4: ...4 Table of contents cont 7 Maintenance 14 7 1 Limiting Conditions 14 8 Products returning 15 8 1 Safety Instructions 15 9 Loss of warranty 15...

Страница 5: ...bove tasks IGEMA GmbH accepts no liability for damage to property or personal injury caused by unqualified persons or by failure to observe these installation and operating instructions If no sufficie...

Страница 6: ...The maximum values of the pressure and temperature range of the device must be checked before installation If the maximum allowable operating values of the device are lower than those of the system on...

Страница 7: ...been depressurised and that the pressure has been safely reduced to atmospheric pressure In principle no system should be regarded as unpressurized even if indicated by pressure measuring devices suc...

Страница 8: ...bH the applicable safety and environmental laws according to GGVSEB German ordinance on the national and international carriage of dangerous goods by road rail and inland waterways must always be obse...

Страница 9: ...solve with the help of this instructions please contact the supplier or the manufacturer The manufacturer reserves the right to change the design and material of this product without notice 3 2 Gener...

Страница 10: ...rotective measures against dirt Correct installation of the equipment is full responsibility of the contractor Sample coolers are designed to be applied in places protected from exposure to weather We...

Страница 11: ...ior to install check that the product is suitable for the intended application materials and pressure temperature ratings Before installing remove plastic covers placed on flanges or connection ends T...

Страница 12: ...12 5 4 Dimensions Pos Description Sample cooler 1 Sample intake 2 Cooling water intake 2a Colling water valve 3 Draining connection 4 Funnel to take a measuring jug 5 Sample outlet 5a Thermometer unit...

Страница 13: ...wing must be checked All works are completed The sample cooler is correctly installed All the necessary safety devices have been installed At start up the presence of small particles in the fluid dirt...

Страница 14: ...ly after a small period of time in order to condense or cool the remaining steam inside the sample cooler 6 3 Periodical checking 24 hours after the start up it is recommended to check the pipe connec...

Страница 15: ...bstances identified as hazardous or potentially hazardous must be provided with the information mentioned above 9 Loss of warranty LOSS OF WARRANTY Total or partial disregard of above instructions inv...

Страница 16: ...16 Antwerpener Str 1 Fon 49 2501 92424 0 48163 M nster Fax 49 2501 92424 99 Deutschland info igema com www igema com IGEMA GmbH...

Отзывы: