1.3  Safety at work 

Before installation or carrying out maintenance work on the device, safe access 
must  be  ensured  and  a  secure  working  area  with  sufficient  lighting  must  be 
defined and marked out.  Always use lifting equipment for heavy loads! 
 
 

Before  starting  any  work,  carefully  check  which  liquids  or  gases  are  or  have  been  in  the 
pipeline. (flammable substances, irritating substances, substances hazardous to health) When 
opening or  dismantling the device,  residues of the medium can escape. Subsequent fumes 
are  also  possible  in  unpressurized  and  cold  systems.  Use  designated  PPE  such  as  safety 
goggles and respiratory protection! 

Special attention must be paid to the condition of the environment around the installation or 
maintenance site. Be aware of e.g.: potentially explosive atmospheres, lack of oxygen in tanks 
and pits, dangerous gases/liquids, extreme temperatures, hot surfaces, fire hazard (e.g. during 
welding) and moving machine and system components. Protect yourself from excessive noise 
by taking the required protective measures. 

For  all  maintenance  work  or  new  installations,  on  new  or  existing  boilers  or  vessels,  it  is 
imperative to check that the boiler or vessel has been depressurised and that the pressure has 
been safely reduced to atmospheric pressure. In principle, no system should be regarded as 
unpressurized even if indicated by pressure measuring devices such as pressure gauges or 
sensors.  When releasing  the  pressure, make  sure  that  no  persons  are  in  the  release  area. 
Carefully check whether you and/or other persons in the vicinity need PPE to protect yourself 
from external influences such as high and low temperatures, radiation, noise, danger to eyes, 
loose objects that can fall down or chemicals.  

There is always a risk of injury when handling large and/or heavy equipment. Observe the load 
handling  regulation  as  a  minimum  requirement  for  working  with  loads.  Avoid  handling  the 
device with your own physical force, e.g. by lifting, pulling, carrying, pushing or supporting it, 
especially to prevent back injuries. Use lifting equipment to move heavy and bulky equipment 
in  accordance  with  Article  1,  Section  2  of  the  German  Load  Handling  Regulation 
(LasthandhabV). 

Under normal operating conditions the surface of the device can become very 
hot!  Under  the  maximum  operating  conditions,  the  surface  temperature  can 
exceed 350°C. After shutting off or, if necessary, shutting down the boiler, wait 
until the temperature has normalized to room level. To avoid the risk of burns 
and scalds, always use PPE including safety goggles! 

 

 

 

Danger 

 

Caution 

hot! 

Содержание IGEMA SC32-SC132

Страница 1: ...Edition 03 2021 D 11 B 53616 EN 00 Installation and maintenance instruction IGEMA SC32 SC132 Sample cooler...

Страница 2: ...e Steam is our passion and we offer you the entire programme for the safe and economic operation of your plants especially in the steam and condensate sector Please read the installation and operating...

Страница 3: ...5 Exclusion of liability 8 2 Contents of the packaging 8 3 General 9 3 1 Note 9 3 2 General Safety Instructions 9 4 Transport and Storage 10 4 1 Safety instruction 10 5 Installation 11 5 1 Safety Ins...

Страница 4: ...4 Table of contents cont 7 Maintenance 14 7 1 Limiting Conditions 14 8 Products returning 15 8 1 Safety Instructions 15 9 Loss of warranty 15...

Страница 5: ...bove tasks IGEMA GmbH accepts no liability for damage to property or personal injury caused by unqualified persons or by failure to observe these installation and operating instructions If no sufficie...

Страница 6: ...The maximum values of the pressure and temperature range of the device must be checked before installation If the maximum allowable operating values of the device are lower than those of the system on...

Страница 7: ...been depressurised and that the pressure has been safely reduced to atmospheric pressure In principle no system should be regarded as unpressurized even if indicated by pressure measuring devices suc...

Страница 8: ...bH the applicable safety and environmental laws according to GGVSEB German ordinance on the national and international carriage of dangerous goods by road rail and inland waterways must always be obse...

Страница 9: ...solve with the help of this instructions please contact the supplier or the manufacturer The manufacturer reserves the right to change the design and material of this product without notice 3 2 Gener...

Страница 10: ...rotective measures against dirt Correct installation of the equipment is full responsibility of the contractor Sample coolers are designed to be applied in places protected from exposure to weather We...

Страница 11: ...ior to install check that the product is suitable for the intended application materials and pressure temperature ratings Before installing remove plastic covers placed on flanges or connection ends T...

Страница 12: ...12 5 4 Dimensions Pos Description Sample cooler 1 Sample intake 2 Cooling water intake 2a Colling water valve 3 Draining connection 4 Funnel to take a measuring jug 5 Sample outlet 5a Thermometer unit...

Страница 13: ...wing must be checked All works are completed The sample cooler is correctly installed All the necessary safety devices have been installed At start up the presence of small particles in the fluid dirt...

Страница 14: ...ly after a small period of time in order to condense or cool the remaining steam inside the sample cooler 6 3 Periodical checking 24 hours after the start up it is recommended to check the pipe connec...

Страница 15: ...bstances identified as hazardous or potentially hazardous must be provided with the information mentioned above 9 Loss of warranty LOSS OF WARRANTY Total or partial disregard of above instructions inv...

Страница 16: ...16 Antwerpener Str 1 Fon 49 2501 92424 0 48163 M nster Fax 49 2501 92424 99 Deutschland info igema com www igema com IGEMA GmbH...

Отзывы: