5. Allgemeine Informationen
Montážní návod
Terra SW
30
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
60
190
1 1/4”
Connection pipe to the
heatpump on site
PE plastic pipe Ø 25
manifold length L
Note:
For TERRA SW 6-17 Complete HGL the brine connection set is already integrated in the heat pump!
Inlet flow
Outlet flow
Filling- and flushing device
Heat source
H
e
a
t s
o
u
rc
e
5.2.3. Installation plan
Notes
-
Only antifreeze approved by IDM-Energiesysteme
GmbH are permitted for use.
-
Brine circuit lines must be fitted with steam
diffusion-proof insulation to protect against con-
densation and ice formation (e.g. Armaflex).
-
Brine circuit pump and brine expansion tank must
be installed on the inlet side of the heat pump
(warm side).
-
Brine circuit pump and brine circuit expansion ves-
sel are integrated in the heat pump.
-
When filling the brine circuit with antifreeze mix
-
ture, the expansion vessel must be filled (due do
the volume reduction when cooling in service).
5.2.4. Design of the depth sensor
Is the use of deep heat by means of probes in the shortlist, then obtain information about the soil conditions
through a geological report. You find out more details on requirements related, the expected soil layers, as well
as notes about the maximum abstraction capacity.
The dimensioning of the depth sensors to achieve the necessary abstraction capacity
must be occured by the drilling company or a geologist. Drilling may be performed only by
a licensed company!