background image

t h e

 

p o w e r

 

f a m i l y

(C) IDM ENERGIESYSTEME GMBH

Montážní návod

 Terra SW

29

1

2

3

4

5

6

7

8

9

10

11

12

13

1

2

3

4

5

ca.1,3m

ca.

0,6m

min  0,5m

min  0,5m

T

T

m³/h

< p

T

T

m³/h

< p

PE-pipe Ø 25

connection pipes 

to heat pump

on site! 

manifold length L

connection set

connection pipes 

to heat pump

on site! 

manifold length L

connection set

brine/groundwater

inlet

brine/groundwater

outlet

loop 1 loop 2 loop 3 loop 4

pipes toward

to heat pump

manifold

water flow meter

(if required for the 

government),

else insert adapter 

pipes out of stainless 

/galvanized steel,

plastic or 

throttle valve

bypass pipe for

flushing the well 

ground water flow direction

min. 15 m

dry well

suction-/

extraction well

filter (

mesh width min 0,4mm

max 0,6mm

brine -

anti freeze

loop

throttle valve

T-piece of the Seikom

flow switch

water pressure switch

ground water

open well

brine-

circulating-

pump

safety-

valve

SAFETY heat -

exchanger set

Safety-

heat exchanger

drain

drain

Heat source

H

e

a

so

u

rc

e

5.1.4. Laying plan

As  an  example  for  one  heat  pump  TERRA  SW  8  
Complete  HGL  with  4  pipe  circuits,  distributor  con-
nection in the cellar

 

-

In  the  pipe  junction  area,  insulate  the  pipe  to  a 
length of 2 m.

 

-

Insulate the brine supply line with cold-resistant ma-
terial; zinc-plated pipes are not permitted for use.

 

-

Minimum distance of the lines of 1m to water and 
run-off lines, and to masonry.

 

-

Masonry  openings  must  be  insulated  and  water-
tight.

 

-

Insert a warning strip approx. 0.5 m above the pipes.

 

-

Create a laying plan and take photos.

 

-

The distributor connection can also be made in a 
shaft outdoors.

5.2. Brine depth sensor

5.2.1. 

Popis

With this system, earth probes are used for the heat 
extraction in the earth area, which consist of plastic 
pipes with a special plastic head.This evaporator sys-
tem requires the minimum ground surface area from 
the earth evaporators. The hole diameter is 125 mm, 
the drilling depth and sensor length depends on the 
heat pump size. The brine medium circulates in these 
plastic pipes. The heat exchange between the brine 
medium and refrigerant takes place in the evaporator 
set (stainless steel plate heat exchanger). 

The  following  is  required  for  the  brine  circuit  con-
nection: Brass distributor with shut-off valves, safety 
valve, pressure gauge, expansion vessel. Thermom-
eter and brine circulating pump are already integrated

The  flexible  connection  hoses  supplied  should  be 

installed to avoid sound transmission. The connection 
lines between the distributor and the heat pump need 
to be created by the customer; zinc-plated pipes must 

not be used! 

.

5.2.2. Scope of deliver y

 - Earth  sensors  made  from  plastic  pipes,  size  de-

pends on heat pump size

 - Connection set in the heat pump integrated
 - Distributor, depending on order

Содержание TERRA SW Series

Страница 1: ...POWE R FAM I LY w w w i d m e n e r g i e c o m Tepeln erpadla s technologi erstv vody Technick dokumentace N vod k obsluze TERRA SW 6 17 pro za zen solanky a podzemn vody s regulac Navig tor 812280...

Страница 2: ...Informationen Mont n n vod Terra SW 2 1 2 3 4 5 6 7 8 9 10 11 12 13 Obsah Obsah 1 V eobecn informace 4 4 4 4 4 4 4 4 4 5 5 5 2 Popis 6 6 6 6 6 7 8 11 3 Mont ze strany topen 12 12 19 4 Mont elekt ina...

Страница 3: ...NERGIESYSTEME GMBH Mont n n vod Terra SW 3 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 Obsah Obsah 5 Zdroj tepla 27 27 27 27 28 29 29 29 29 30 30 31 31 31 32 33 6 g 34 34 34 34 34 We reserve the right to make t...

Страница 4: ...transportovan ho erpadla odstranit teprve tehdy kdy se erpadlo nach z na m st kde m b t zabudov no Sou sti erpadla nesm b t pokl d na ven Tepeln erpadla nesm b t umis ov na do vlhk ch nebo pra n ch m...

Страница 5: ...EN DVGW VDI VDE p edpisy m stn ch z sobovac ch podnik Tepeln erpadlo TERRA SW mus b t um st no v m stnosti chr n n p ed mrazem teplota m stnosti se mus pohybovat mezi 5 C a 35 C Aby byly minimalizov n...

Страница 6: ...odate n ho vn j ho roz en pro t i sm sn p m topn okruhy Tepeln erpadla TERRA SW 6 17 pracuj s bezpe nostn m chladivem R410A kter p i dn mont i a uveden do provozu cirkuluje v uzav en m okruhu a prakti...

Страница 7: ...Rozm ry p poj viz technick data na n sleduj c ch str nk ch na zadn stran tepeln ho erpadla se nach z n lepka s popisem p ipojen TERRA SW 6 17 3 1 2 4 7 6 5 1095 5 199 60 476 203 116 230 116 637 5 760...

Страница 8: ...P kon kompresoru N b hov proud kompresor A 13 13 13 13 13 A 13 13 20 13 25 16 32 16 R410A R410A R410A R410A R410A kg 1 30 1 60 1 85 2 12 2 40 lt 0 70 1 20 1 20 1 20 1 90 m 2 95 3 63 4 20 4 82 5 45 db...

Страница 9: ...Pa 7 7 9 10 12 Free residual pressure of the charging pump kPa 61 60 55 45 60 For heat pumps with process reversal Cooling output at W B 15 C 7W C kW 5 60 6 90 9 50 12 50 16 40 Cooling output at W B 1...

Страница 10: ...1 1 1 1 1 Maximum flow temperature C 62 62 62 62 62 Minimum heating water quantity l h 1 200 1 600 2 050 2 750 3 500 Pressure loss on heating side kPa 7 8 9 10 13 Free residual pressure of the chargin...

Страница 11: ...mn vodou Jin m dia p en ej c teplo nejsou p pustn D le nen dovoleno zah v n jin ch kapalin ne je topn voda kvalita topn vody viz str 18 Tepeln erpadla podl haj p irozen hranic m pou it viz skica kter...

Страница 12: ...padel na ploch ch nebo podlah ch ur en ch pro lehk stavby U plovouc ch mazanin podlahy by m la b t mazanina a tlumen zvuku krok kolem tepeln ho erpadla vykrojeny viz vyobrazen vedle Platn z kony p edp...

Страница 13: ...33 B41 B34 B42 B1 M22 M73 B35 B51 B61 M16 TERRA SW Complete HGL Hygienik HW CW OS RE FS Note This is only a tentative suggestion for installing an IDM heat pump in the heating system This suggestion r...

Страница 14: ...hole system T M75 B73 T T T T M TERRA T T B32 B61 B51 B35 B33 B34 B41 B42 B1 M22 M73 M31 M41 M16 T T P T B38 Mont ze strany topen Mont ze strany topen Tepeln erpadlo TERRA SW 6 17 se za zen m Hygienik...

Страница 15: ...speicherf hler bei Verwendung des Durchflussz hlers zur W rmemengenerfassung additional Solar board TERRA Complete HGL Buffer Mont ze strany topen Mont ze strany topen V hydraulick m sch matu zobrazen...

Страница 16: ...t exchanger for the cooling freezing in winter mode during heating The pipework must also be designed so that there are flows in cool ing mode both the heat exchanger for the cooling and evaporator in...

Страница 17: ...l valve is used for the change between heating and cooling circuit The heat pump is operated with process reversal and cools the cooling buffer on desired flow TERRA SW Complete HGL P Hygienik with ST...

Страница 18: ...or active coolingwith the heat pump The waste heat can be used e g for hot water preparation or pool heating Furthermore the waste heat can be dissipate into the ground soil Caution The dew point temp...

Страница 19: ...draining options at the lowest points To avoid heat loss connection lines should be insu lated using suitable material Oxygen diffusion With plastic pipe underfloor heating or open heating systems whi...

Страница 20: ...ired series connected fuse for the primary circuit can be looked up on the circuit diagramm It is essential that a slow blow fuse is used charac teristic C The relevant cable cross section must be det...

Страница 21: ...ing unit H8 F6 F1 F2 H4 F8 F4 F5 H7 F10 H6 F3 H5 H1 H3 H2 SD Card Installing the electrics Installing the electrics 4 2 Connection plan for electrical assemblies The central unit on the control is loc...

Страница 22: ...run dry When removing the cover hood ensure that the con nection cable between the operating panel and the central unit is only approx 1m long when the oper ating panel is already connected When remov...

Страница 23: ...logical us as living beings as well as technical electrical systems They generate undesir able fault currents which can have different effects The effects on biological systems can only be guessed at...

Страница 24: ...eparately form mains cables see EMC issue It is recommended to use shielded cable 4 7 2 Sensor equipment The following sensors are included as standard or are already fitted and are necessary in all c...

Страница 25: ...rmostat in series 4 11 Composite signal zone valves The composite signal zone valve setting generates a request when one of the zone valves is open The difference to a room thermostat function is that...

Страница 26: ...oom units Communication with the Navigator control is effected via a CAN bus connection This allows the Navigator controller to be placed up to 300m away With casca de systems the usage of the externa...

Страница 27: ...led due to a reduction in volume when cooling in operation The mixing ratio of the brine medium has to be chosen for 15 C 30 antifreeze ratio If to much antifreeze is mixed the specific heat capac ity...

Страница 28: ...560 Connection line mm 32 40 40 40 50 Brine circulating pump 25 6 25 6 25 7 25 7 25 7 Distributor length mm 180 240 300 360 420 Brine mixture lt 105 140 175 210 245 Brine mixture 30 antifreeze proport...

Страница 29: ...ght Insert a warning strip approx 0 5 m above the pipes Create a laying plan and take photos The distributor connection can also be made in a shaft outdoors 5 2 Brine depth sensor 5 2 1 Popis With thi...

Страница 30: ...Armaflex Brine circuit pump and brine expansion tank must be installed on the inlet side of the heat pump warm side Brine circuit pump and brine circuit expansion ves sel are integrated in the heat pu...

Страница 31: ...d safety heat exchanger where appropriate Lay the incoming and outgoing lines to be frost proof sloping towards the reservoir The lines in the building should be insulated against condensation From th...

Страница 32: ...via a safety heat exchanger by a brine circuit This means that any damage in the groundwater circuit or in the safety heat exchanger does not result in any additional damage to the heat pump At ground...

Страница 33: ...d the brine can not flow out This procedure avoids dirt in the heat pump The ball valve must be installed in the return flow of the heat pump The ball valve is in the shipment of the rinsing device Th...

Страница 34: ...changed where necessary The heat pump is fitted with a start up delay If the heat pump is to be drained on the heating side the connection hose on the heat pump return must be disconnected With ground...

Страница 35: ...EN 61000 3 2 3 Notified body T V AUSTRIA SERVICE GMBH 0408 Krugerstra e 16 1015 Wien Concerning following products Direct evaporation heat pumps TERRA DE HGL with HGL technology Brine water respective...

Страница 36: ...DQUARTERS IN EASTERN TYROL AUSTRIA IDM ENERGIESYSTEME GMBH Seblas 16 18 A 9971 Matrei in Osttirol Austria Telephone 43 0 4875 6172 0 Fax 43 0 4875 6172 85 E mail team idm energie at w w w i d m e n e...

Отзывы: