t h e
p o w e r
f a m i l y
(C) IDM ENERGIESYSTEME GMBH
Montážní návod
Terra SW
29
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
5
ca.1,3m
ca.
0,6m
min 0,5m
min 0,5m
T
T
m³/h
< p
T
T
m³/h
< p
PE-pipe Ø 25
connection pipes
to heat pump
on site!
manifold length L
connection set
connection pipes
to heat pump
on site!
manifold length L
connection set
brine/groundwater
inlet
brine/groundwater
outlet
loop 1 loop 2 loop 3 loop 4
pipes toward
to heat pump
manifold
water flow meter
(if required for the
government),
else insert adapter
pipes out of stainless
/galvanized steel,
plastic or
throttle valve
bypass pipe for
flushing the well
ground water flow direction
min. 15 m
dry well
suction-/
extraction well
filter (
mesh width min 0,4mm
max 0,6mm
brine -
anti freeze
loop
throttle valve
T-piece of the Seikom
flow switch
water pressure switch
ground water
open well
brine-
circulating-
pump
safety-
valve
SAFETY heat -
exchanger set
Safety-
heat exchanger
drain
drain
Heat source
H
e
a
t
so
u
rc
e
5.1.4. Laying plan
As an example for one heat pump TERRA SW 8
Complete HGL with 4 pipe circuits, distributor con-
nection in the cellar
-
In the pipe junction area, insulate the pipe to a
length of 2 m.
-
Insulate the brine supply line with cold-resistant ma-
terial; zinc-plated pipes are not permitted for use.
-
Minimum distance of the lines of 1m to water and
run-off lines, and to masonry.
-
Masonry openings must be insulated and water-
tight.
-
Insert a warning strip approx. 0.5 m above the pipes.
-
Create a laying plan and take photos.
-
The distributor connection can also be made in a
shaft outdoors.
5.2. Brine depth sensor
5.2.1.
Popis
With this system, earth probes are used for the heat
extraction in the earth area, which consist of plastic
pipes with a special plastic head.This evaporator sys-
tem requires the minimum ground surface area from
the earth evaporators. The hole diameter is 125 mm,
the drilling depth and sensor length depends on the
heat pump size. The brine medium circulates in these
plastic pipes. The heat exchange between the brine
medium and refrigerant takes place in the evaporator
set (stainless steel plate heat exchanger).
The following is required for the brine circuit con-
nection: Brass distributor with shut-off valves, safety
valve, pressure gauge, expansion vessel. Thermom-
eter and brine circulating pump are already integrated
The flexible connection hoses supplied should be
installed to avoid sound transmission. The connection
lines between the distributor and the heat pump need
to be created by the customer; zinc-plated pipes must
not be used!
.
5.2.2. Scope of deliver y
- Earth sensors made from plastic pipes, size de-
pends on heat pump size
- Connection set in the heat pump integrated
- Distributor, depending on order