
Configuration and Commissioning
HR9Z-B2200 8/2020
81
Configuration Procedure
Step
Action
1
Verify that the device has been wired according to the safety-related function to be configured.
2
Remove power if the device is not powered off.
If an extension module HR6S-EP is connected, remove power from the extension module as
well.
3
Open the transparent cover of the device.
4
Set the application function selector to the required application function.
5
Set the start function selector to the required start function.
6
Commission the device according to the chapter Commissioning
Содержание HR6S-DN
Страница 1: ...http www idec com HR6S DN Safety Module Original instructions HR9Z B2200...
Страница 8: ...8 HR9Z B2200 8 2020...
Страница 14: ...14 HR9Z B2200 8 2020...
Страница 20: ...Introduction 20 HR9Z B2200 8 2020...
Страница 56: ...Installation 56 HR9Z B2200 8 2020...
Страница 60: ...Functions 60 HR9Z B2200 8 2020 Wiring of the inputs for Emergency Stop Wiring of the inputs for guards...
Страница 64: ...Functions 64 HR9Z B2200 8 2020 Wiring of the inputs for coded magnetic switches...
Страница 66: ...Functions 66 HR9Z B2200 8 2020 Wiring of the inputs for coded magnetic switches...
Страница 69: ...Functions HR9Z B2200 8 2020 69 Wiring of the inputs for sensors devices with two PNP outputs...
Страница 72: ...Functions 72 HR9Z B2200 8 2020 Wiring of the inputs for sensors devices with OSSD outputs...
Страница 98: ...Accessories Service Maintenance and Disposal 98 HR9Z B2200 8 2020...