23
EVOMAX
-
Installation & Servicing
InStALLAtIon
In
S
t
ALLA
t
Ion
1. IntERnAL to SInk WAStE
uPStREAm of SInk WAStE tRAP
Notes: ALL EXTERNAL PIPE RUNS MUST BE IN ACCORDANCE WITH BS 6798
28 ConDEnSAtE PIPE tERmInAtIon ConfIGuRAtIonS
2. IntERnAL ConnECtIon to SoIL AnD VEnt StACk
* Make connection to SVP using a solvent welded saddle
BOILER
External
wall
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
DRAIN
cla7775
3. tERmInAtIon to SoAk AWAy
5. TERMINATION TO dRAIN / GUlly
BOILER
External
wall
Ground Level
Termination
to Soak away
cla7774
minimum
500mm
BOILER
esp8882
BOILER
cla7771a
DRAIN
Ground Level
Open end of pipe
direct into gulley
below grating but
above water level
206210-3.indd 23
09/06/2011 13:34:28