42
Installation and Servicing
Section 3 - Servicing
SER
VICING
3.14 RETURN THERMISTOR REPLACEMENT
1. Isolate and drain down the boiler.
2. Remove the clip from the pump housing and remove
the thermistor.
3. Disconnect the electrical lead from the thermistor.
4. Reconnect the electrical lead to the new thermistor
and reassemble, ensuring that the thermistor is fully
engaged and the clip is correctly located.
Refer to Section
3.2
2
3.15 SPARK GENERATOR REPLACEMENT
1. Disconnect the leads from the spark generator.
2. Gently push down the generator to release the top clip
from the gas valve mounting bracket.
3. Lift the spark generator up and out of the bottom retaining
location point.
Refer to Section
3.2
4. Fit the new spark generator and re-assemble
ensuring that the the earth lead is replaced.
Содержание LOGIC COMBI2 C24
Страница 62: ...62 Installation and Servicing Section 6 Benchmark to Commissioning ...
Страница 68: ...68 Notes Installation and Servicing ...
Страница 69: ...69 Notes Installation and Servicing ...