![Ideal Heating LOGIC COMBI2 C24 Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/ideal-heating/logic-combi2-c24/logic-combi2-c24_installation-and-servicing_617082025.webp)
25
Installation and Servicing
Section 2 - Installation
INST
ALLA
TION
Filling
Loop
CH Flow
DHW
Outlet
Gas
Supply
DHW
Inlet
CH
Return
WATER CONNECTIONS CH
1.
Connect the CH flow service valve (black handle) and
copper tail provided in the hardware pack to the threaded
boss connection provided at the lower rear of the boiler.
2.
Connect the CH return. valve (black handle) and copper tail.
WATER CONNECTIONS DHW
1.
Fit the DHW inlet service valve (blue handle) and copper
tail to the threaded boss connection ensuring the seal
provided is correctly located.
2.
Fit the DHW outlet pipe tail to DHW outlet connection,
ensuring the seal provided is correctly located.
3.
Fit the filling loop provided between the DHW inlet valve
and the CH return valve.
GAS CONNECTION
For details of the position of the gas connection:
PRV DRAIN
The PRV connection, located at the bottom left-hand side
of the boiler, comprises an open ended grommet.
IMPORTANT
The grommet is designed for 15 mm Ø copper pipe.
If possible, preassemble and solder the pipework before
Installing.
If this is not possible the soldering must be more than
100 mm away from the grommet. Make sure the grommet
is not damaged by the heat.
Install the condensate pipe as follows:
1. Make sure that the 15 mm Ø copper
pipe is cut perpendicular to the pipe.
2. Make sure that the pipe is not
damaged, and clean and free from
burs.
3. Using pliers put the clip over the
grommet. Continue to hold the clip
open.
Note.
Do not release the clip until step 5 (see below).
4. Push the copper pipe into the grommet (minimum of
15 mm). Make sure that the pipe is parallel with the
grommet.
5. Below the stop mark on the grommet open the pliers to
release the clip.
6. Make sure that the clip and pipe are attached correctly.
7. Make sure that the PRV discharge pipe is correctly
attached. Make sure that the angle of the pipe run is
sufficient to remove discharged water.
CAUTION:
Heating the isolation valves may damage the
fibre seals
CAUTION:
The gas service cock is sealed with a non-
metallic blue fibre washer, which must not be overheated
when making capillary connections.
Fit each union with the fibre seals provided.
Stop
point
Clip
15 mm
SCAN
for video
The domestic hot water flow rate is automatically
regulated to a maximum:
kW
L/m
gpm
24
9.9
2.2
30
12.4
2.8
35
14.5
3.2
2.17 CONNECTIONS & FILLING
Refer to Gas Supply
1.9
Refer to Section
1.14
WARNING:
Make sure that the water or steam
(from the boiler) is discharged safely. Hot water or
steam is dangerous and can cause serious injury, and
damage to electrical systems.
Содержание LOGIC COMBI2 C24
Страница 62: ...62 Installation and Servicing Section 6 Benchmark to Commissioning ...
Страница 68: ...68 Notes Installation and Servicing ...
Страница 69: ...69 Notes Installation and Servicing ...