1.14 BOILER DIMENSIONS, SERVICES & CLEARANCES
The boiler connections are made on the boiler connection
tails.
The following minimum clearances must be maintained
for operation and servicing.
Additional space will be required for installation, depending
upon site conditions.
Side and Rear Flue
a.
Provided that the flue hole is cut accurately, e.g. with a core
drill, the flue can be installed from inside the building where
wall thicknesses do not exceed 600 mm.
Front Clearance
The minimum front clearance when built in to a cupboard is
5 mm from the cupboard door but 450 mm overall clearance
is still required, with the cupboard door open, to allow for
servicing.
*
Bottom Clearance
Bottom clearance after installation can be reduced to 5 mm.
This must be obtained with an easily removable panel to
provide the 100 mm clearance required for servicing.
395
75
61
36
21
33
32
43.5
94
Refer to Section
2.17
278
700
100*
Flue
terminal
2.5
2.5
from case
Underside View - Dimension to Wall
CH
Flow
DHW
Outlet
Gas
DHW
Inlet
CH
Return
CH Circuit
Drain
Cond.
Drain
98
200
152
PRV Grommet
Refer to Section
2.17
IMPORTANT:
Please ensure there is sufficient
clearance either side and below the boiler, particularly from
door hinges and the base of a cupboard.
Measurements in mm
PRV
Grommet
75
61
36
21
33
32
43.5
94
Water and Gas Connections
Data
Plate
CH
Flow
DHW
Outlet
PRV
Grommet
CH
Return
DHW
Inlet
Gas
Inlet
Cond.
Drain
Measurements in mm
Содержание LOGIC COMBI2 C24
Страница 62: ...62 Installation and Servicing Section 6 Benchmark to Commissioning ...
Страница 68: ...68 Notes Installation and Servicing ...
Страница 69: ...69 Notes Installation and Servicing ...