35
If Interval is selected then the following
screen will be shown and the interval
between Antilegionella cycles can be set:
Interval
7day(s)
Done
Once the interval is set select ‘Done’.
Interval
7day(s)
Done
Once again the Antilegionella Tank
temperature can be set followed by ‘Done’.
Antilegionella temperature
65ºC
Done
Antilegionella temperature
65ºC
Done
The next step is to set the initial mode of
operation for this Domestic Hot Water circuit.
By selecting the highlighted field the choices
are shown in the following screens. Once
selected then select ‘Done’.
Operating mode
Standby
Done
Operating mode
Time clock single day
Done
Operating mode
Time clock multiple days
Done
Operating mode
Standby
Done
Once completed the following screen will
be displayed:
Select DHW to configure
DHW1 Boiler 1
Done
Note: The Domestic Hot Water circuit that
has just been configured will now have a ‘
’
next to its designation.
The next allocated Domestic Hot Water
circuit to configure can now be selected.
The process above is then repeated for all
Domestic Hot Water circuits in the cascade.
The next allocated Domestic Hot Water
circuit to configure can now be selected.
The process above is then repeated for all
Domestic Hot Water circuits in the cascade.
Select DHW to configure
DHW1 Boiler 1
Done
After all Domestic Hot Water Circuits have
been configured, select ‘Done’.
If a slave boiler is present the Master data
can be stored on this System manager for
safe keeping.
Store backup?
No
Yes
Store backup?
No
Yes
Store backup?
2
Done
The system configuration has now been
completed. The settings relating to the Plant,
Heating circuits and Domestic Hot Water
circuits can be changed in the corresponding
settings menu within each of the sections of
the menus system. Refer to the operating
guide section of this manual.
The system will now reboot and the following
screens will be displayed:
443.207.001
< BRAND LOGO >
Loading system table
Then the following status screen will be
shown, this screen shows the boiler status
for a Master boiler in a cascade, a second
status screen exists and can be accessed
by rotating the know anticlockwise:
<
Boiler Name & Model No.
>
Operation: Standby
Boiler Setp.: 0%
Boiler cap.: 0%
Flow temp.: 40.2ºC
This then shows that status of the Plant.
<
Boiler Name & Model No.
>
Operation: Standby
Plant Setp.: 0%
Plant cap.: 0%
Header: 40.2ºC
No configuration is specifically required
for the Cascade Manager. Refer to the
Operating Guide for the status and settings
within this function.
Содержание EVOMAX 2
Страница 24: ...24 4 INSTALLATION 4 1 Electrical Connections Figure 2 VARICAN ADAPTOR DIAGRAM Figure 3 EXTENSION MODULE DIAGRAM...
Страница 46: ...46...
Страница 47: ...47...