33
The next step is to configure the pump
protection function for this specific heating
circuit.
Configure pump protection?
No
Yes
If Pump protection is selected then an
associated period can be set, the time
duration between protection cycles and the
time point at which the function should start
to operate the pump.
Pump protection interval
1day(s)
Done
Pump protection time point
12:00
Done
The next step is to select if any DHW circuit
demand configured in the system has priority
over this specific heating circuit. If ‘Yes’ is
selected than any DHW circuit demand will
interrupt the Heating Circuit function.
DHW priority?
No
Yes
The next step is to set the initial mode
of operation for this Heating Circuit. By
selecting the highlighted field the choices
are shown in the following screens. Once
selected then select ‘Done’.
Operating mode
Standby
Done
Operating mode
Time clock single day
Done
Operating mode
Time clock multiple days
Done
Operating mode
Day
Done
Operating mode
Night
Done
Operating mode
Day
Done
Once completed the following screen will
be displayed:
Select HC to configure
HC1 Boiler 1.1
HC2 Boiler 2.1
HC3 Boiler 2.2
Note: The Heating Circuit that has just been
configured will now have a ‘
’ next to its
designation.
The next allocated Heating Circuit to
configure can now be selected. The process
above is then repeated for all Heating
Circuits in the cascade.
Select HC to configure
HC3 Boiler 2.2
Done
After all Heating Circuits have been
configured, select ‘Done’.
Содержание EVOMAX 2
Страница 24: ...24 4 INSTALLATION 4 1 Electrical Connections Figure 2 VARICAN ADAPTOR DIAGRAM Figure 3 EXTENSION MODULE DIAGRAM...
Страница 46: ...46...
Страница 47: ...47...