10
Buccaneer GTE -
Installation & Servicing
INSTALLATION
9
BURNER CONNECTION
Gas Supply
The gas supply MUST be sized in accordance with British Gas
recommendations.
The Local Gas Authority should be contacted, at a stage prior
to actual installation, for any advice or information required.
Details and advice, relating to the use of L.P.G. for firing the
BUCCANEER GTE range of heating boilers, are available on
request to Caradon Ideal Limited.
Oil Storage Tank
The oil storage tank, oil supply pipe and connections to the
burner unit MUST comply with the requirements of BS. 799.
The installation should conform to the recognised standards of
good practice in the trade and comply with the relevant Codes of
Practice, building Regulations and Local Authority, Fire and
Insurance requirements.
Piercing Ø of the burner door
300
104
> 0
10
deflector
buc5494
IMPORTANT
. The burner head deflector must go past the door
insulation as shown opposite.
Connection, adjustment, start-up and maintenance. (Refer to
the instructions delivered with the burner)
If there is space between the burner blast tube and door insulation after mounting the burner, a suitable insulation material
must be used to pack the space.
INST
ALLA
TION
Содержание Buccaneer GTE 5
Страница 1: ......
Страница 38: ...38 Buccaneer GTE Installation Servicing NOTES...
Страница 39: ...39 Buccaneer GTE Installation Servicing NOTES...