23
CONTROL PANEL INSTALLATION
NOTE: the control panel picture is purely indicative as it may vary according to the type of panel installed.
TOP INSTALLATION
6) Install the control panel support (3) included in the kit on the front beam of the boiler.
7) Place the control panel (4) onto the support (3) and insert the boiler adjustment thermostats capillary
tubes, the safety thermostat capillary tubes, the circulator consent thermostat capillary tubes and the
boiler thermometer capillary tubes through the relevant openings, until the bulb-holding manholes (5) on
the shell have been reached.
8) Fasten the control panel onto the support using the screws provided.
SIDE INSTALLATION
6) The control panel can be mounted either on the right or left after mounting the panel support stave (6)
7) Place the control panel in the vicinity of the stave (6) and pass the capillaries through the relevant open-
ings, until the bulb-holding manholes (5) on the shell have been reached.
8) Fasten the control panel onto the stave using the screws provided.
9) Finish inserting the lags and installing the closing profiles (2) using the self-tapping screws on the man-
hole side.
2
4
3
5
6