15
5.5
INSTALLATION OF GREENOx.e 80 ÷ 300 BOILER CONTROL PANEL
NOTE: the control panel picture is purely indicative as it may vary according to the type of panel installed.
a. Choose the side on which to install the control panel (RH or LH), remove the covers (1) and push in
the pre-cut opening (2).
b. Pick up the kit of the arm complete with bracket (3).
c. Open the control panel (4) and cut the preset window on the rear side.
d. Pass the bulbs (5) of thermostats and thermometer through the window and screw them in the
square pipe of the bracket and slide them in the protective tube through top openings until they reach
the wells (6). Lock them using the special locking springs.
e. Connect the cables of burner (7) to the control panel using a protective sheath and lock them with
the cable glands (8).
f.
Secure the control panel to the bracket (3) using the kit supplied.
g. Use the two screws (9) and fasten the arm-control panel group to the top section of the boiler.
h. Assemble the covers (1).
1
1
2
3
4
5
6
7
8
9
Содержание GREENOx BT COND 180
Страница 31: ......