22
4) Insert the staves, with the previously installed stoppers, between the uprights and the beams, as shown
in the figure.
PLEASE NOTE: do not cover the upper corner on the manhole side; this is required for the subse-
quent installation of the control panel and its bulbs.
5) After inserting the lags and fastening the relevant central masks (1), install the closing profiles (2) using
the self-tapping screws, on the side opposite the manholes.
1
2
Содержание GREENOx BT COND 180
Страница 31: ......