CHECK PROCEDURE
Testing HPCO switch
1. Leave all wiring connectors attached and perform
testing within the 60 minute time delay period
2. Check for line voltage at CN10 connector on control
board (Two wire connector with black & blue wires).
A. Line voltage present - HPCO switch has reset
and closed.
B. No line voltage present - HPCO switch is open.
Verify pressure.
•
If the HPCO is opening at a pressure
significantly lower or higher than the
control setting of 426 psig, replace
the HPCO.
•
If the HPCO is open at a pressure that
is above cut-in, find root cause problem.
Fan motor, dirty condenser, refrigeration
system issue, etc. The ice machine will go
to an initial start sequence when the
HPCO closes.
112
Содержание IM Series
Страница 1: ...Revision Date 1 24 22 IM Series Air Water Remote Ice Machines Technician s Handbook ...
Страница 2: ......
Страница 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 9: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 15: ...THIS PAGE INTENTIONALLY LEFT BLANK 14 ...
Страница 17: ...How to Read a Serial Number Full Serial Number 16 ...
Страница 35: ...THIS PAGE INTENTIONALL Y LEFT BLANK 34 ...
Страница 48: ...Flexible Numeric Display FND Functions 47 ...
Страница 93: ...THIS PAGE INTENTIONALLY LEFT BLANK 92 ...
Страница 106: ...Testing the water level sensor Before S N Starting With VC 105 ...
Страница 134: ...SERVICE REMOTE RECOVERY EVACUATION CONNECTIONS 133 ...
Страница 145: ...THIS PAGE INTENTIONALLY LEFT BLANK 144 ...
Страница 154: ...IM1100 SERIES IM1100R Remote Air Cooled Model Characteristics vary depending on operating conditions CYCLE TIMES 153 ...
Страница 155: ...THIS PAGE INTENTIONALLY LEFT BLANK 154 ...
Страница 157: ...Wiring Diagram 156 ...
Страница 158: ...PCB Layout 157 ...
Страница 159: ...PCB Dip Switches 158 ...
Страница 161: ...SPACE FOR TECHNICIAN S NOTES ...
Страница 162: ...SPACE FOR TECHNICIAN S NOTES ...
Страница 163: ...SPACE FOR TECHNICIAN S NOTES ...
Страница 164: ...SPACE FOR TECHNICIAN S NOTES ...
Страница 165: ......