Chapter
4.
Installing
the
uninterruptible
power
supply,
the
master
console,
and
the
SAN
Volume
Controller
This
chapter
describes
the
steps
that
you
need
to
perform
to
install
the
SAN
Volume
Controller
and
the
uninterruptible
power
supply
including
the
following:
1.
Preparing
for
the
installation
2.
Installing
the
support
rails
for
the
uninterruptible
power
supply
3.
Installing
the
uninterruptible
power
supply
4.
Installing
the
master
console
5.
Installing
the
support
rails
for
the
SAN
Volume
Controller
6.
Installing
the
SAN
Volume
Controller
into
the
rack
7.
Connecting
the
SAN
Volume
Controller
to
the
uninterruptible
power
supply
Attention:
Before
you
begin
the
installation,
ensure
that
the
customer
has
completed
the
planning
table
for
the
hardware
that
you
are
about
to
install.
If
you
are
connecting
cables
to
switches
that
are
currently
in
use,
confirm
with
the
customer
that
it
is
safe
for
you
to
proceed.
Go
no
further
with
these
instructions
until
you
are
satisfied
that
all
the
information
is
correct
and
valid.
Related
topics:
v
Preparing
for
installation
Before
you
start
to
install
the
uninterruptible
power
supply
and
the
SAN
Volume
Controller,
ensure
that
you
have
everything
that
you
need,
including
the
customer
completed
planning
tables
and
charts
provided
in
the
These
tables
include
the
location
of
hardware,
cable
connection,
and
configuration
data
information
that
you
will
need
to
complete
the
installation
procedures.
Steps:
Perform
the
following
steps:
1.
Check
all
the
parts
and
quantities
against
the
items
shown
in
the
following
figure.
If
any
item
is
missing,
contact
your
marketing
representative.
1
SAN
Volume
Controller
4
Uninterruptible
power
supply
rail
kit
2
SAN
Volume
Controller
support
rails
(2)
5
Power
and
signal
cable
3
Uninterruptible
power
supply
(2)
©
Copyright
IBM
Corp.
2003,
2004
15
Содержание TotalStorage
Страница 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Страница 2: ......
Страница 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...
Страница 22: ...xx Installation Guide...
Страница 36: ...14 Installation Guide...
Страница 58: ...36 Installation Guide...
Страница 74: ...52 Installation Guide...
Страница 80: ...58 Installation Guide...
Страница 84: ...62 Installation Guide...
Страница 89: ......
Страница 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...
Страница 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...