background image

5.

   

Gently

 

push

 

the

 

latch

 

lock

 

2

 

(Figure

 

28

 

)

 

away

 

from

 

the

 

rail

 

as

 

you

 

move

 

the

 

latch

 

lever

 

1

 

towards

 

the

 

far

 

end

 

of

 

the

 

rail.

 

The

 

latch-lock

 

carrier

 

assembly

 

slides

 

against

 

the

 

spring

 

tension.

   

6.

   

Continue

 

to

 

slide

 

the

 

latch-lock

 

carrier

 

for

 

approximately

 

13

 

mm

 

(0.5

 

in).

 

The

 

latch

 

lever

 

engages

 

a

 

hole

 

in

 

the

 

back

 

bracket

 

assembly,

 

and

 

holds

 

the

 

latch-lock

 

carrier

 

in

 

the

 

retracted

 

position.

  

7.

   

Push

 

the

 

back

 

rail

 

bracket

 

1

 

(Figure

 

29

 

on

 

page

 

28)

 

toward

 

the

 

front

 

of

 

the

 

rail

 

until

 

it

 

stops.

 

The

 

rail

 

is

 

now

 

at

 

its

 

shortest

 

adjustment.

  

1

2

  

Figure

 

27.

 

Retracting

 

the

 

latch

 

lock

 

carrier

1

2

1

2

Front

  

Figure

 

28.

 

Opening

 

the

 

front

 

latch-lock

 

carrier

 

assembly

  

Chapter

 

4.

 

Installing

 

the

 

uninterruptible

 

power

 

supply,

 

the

 

master

 

console,

 

and

 

the

 

SAN

 

Volume

 

Controller

 

27

Содержание TotalStorage

Страница 1: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...

Страница 2: ......

Страница 3: ...IBM TotalStorage SAN Volume Controller Installation Guide V ersion 1 2 0 SC26 7541 02...

Страница 4: ...the information in Notices on page 53 Third Edition April 2004 Copyright International Business Machines Corporation 2003 2004 All rights reserved US Government Users Restricted Rights Use duplication...

Страница 5: ...neral alarm indicator 12 Chapter 3 Master console 13 Chapter 4 Installing the uninterruptible power supply the master console and the SAN Volume Controller 15 Preparing for installation 15 Installing...

Страница 6: ...vis de conformit la r glementation d Industrie Canada 56 New Zealand compliance statement 56 International Electrotechnical Commission IEC statement 56 Industry Canada compliance statement 56 United K...

Страница 7: ...ntroller library Table 1 lists and describes the publications that make up the SAN Volume Controller library Unless otherwise noted these publications are available in Adobe portable document format P...

Страница 8: ...ervice the SAN Volume Controller SC26 7542 IBM TotalStorage SAN Volume Controller Translated Safety Notices This guide contains the danger and caution notices for the SAN Volume Controller The notices...

Страница 9: ...publications Register and you can create your own profile of publications that interest you The publications notification system sends you a daily e mail that contains information about new or revise...

Страница 10: ...e number or table number v Mail or fax Fill out the Readers Comments form RCF at the back of this book Return it by mail or fax 1 408 256 0488 or give it to an IBM representative If the RCF has been r...

Страница 11: ...ring an electrical storm do not connect or disconnect cables or station protectors for communications lines display stations printers or telephones 2 DANGER Do not attempt to open the covers of the po...

Страница 12: ...AUTION To comply with international standards and wiring regulations the total equipment connected to the output of the uninterruptible power supply must not have an earth leakage current greater than...

Страница 13: ...present a risk of fire or explosion The battery connector is polarized do not attempt to reverse the polarity Dispose of the battery according to local regulations 22 Related topics v Danger notices...

Страница 14: ...emoved or disturbed 9 Before connecting the SAN Volume Controller to the SAN check the grounding Related topics v Checking the grounding of the SAN Volume Controller and the uninterruptible power supp...

Страница 15: ...cracks or pinching Related topics v Inspecting the SAN Volume Controller for unsafe conditions on page xi v External machine checks on page xii Checking the grounding of the SAN Volume Controller and...

Страница 16: ...new one Then perform a complete grounding check again If the uninterruptible power supply has continuity you might have a problem with the power cable or with the grounding of the host system 8 Check...

Страница 17: ...uency supplied must be between 50 and 60 Hz Note If the uninterruptible power supply is cascaded from another uninterruptible power supply the source uninterruptible power supply must have at least 3...

Страница 18: ...machine is manufactured from new parts or new and used parts ME01 A E A A Registered Trademark of International Business Machines Corporation IBM Canada Ltd Registered User 1 1 Marca Registrada E 09 0...

Страница 19: ...ply 2 1 3 2 1 3 COM SURGE SUPPRESSOR GROUND SCREW Remove to comply with national deviations UK DE SE INPUT INLET LOAD GROUP 1 16A MAX REPO CONNECTOR A Use Class 2 Input Only Utilisez Uniquement Une Al...

Страница 20: ...ack program that ensures proper handling of the product Contact your IBM representative for more information Product disposal This unit might contain batteries Remove and discard these batteries or re...

Страница 21: ...tatic discharge observe the following precautions v Limit your movement Movement can cause static electricity to build up around you v Handle the device carefully holding it by its edges or its frame...

Страница 22: ...xx Installation Guide...

Страница 23: ...to a logical volume manager LVM on a SAN It performs the following functions for the SAN storage that it is controlling v Creates a single pool of storage v Manages logical volumes v Provides advance...

Страница 24: ...isk zone In the host zone the host systems can identify and address the nodes You can have more than one host zone Generally you will create one host zone per operating system type In the disk zone th...

Страница 25: ...cluster SAN Volume Controller operating environment v Minimum of one pair of SAN Volume Controller nodes v Two uninterruptible power supplies v One master console is required per SAN installation for...

Страница 26: ...Node identification label on page 6 v Power button v Power LED on page 5 v Check LED on page 5 v Navigation buttons on page 5 v Select button on page 5 v Front panel display on page 5 Power button The...

Страница 27: ...roller cluster code is being upgraded it is normal for the check LED to come on Related topics v Controls and indicators for the SAN Volume Controller on page 4 Navigation buttons Four navigational bu...

Страница 28: ...ed on the front panel display when node is selected from the menu If the front panel is replaced the configuration and service software will display the number that is printed on the front of the repl...

Страница 29: ...ower supply must be used in accordance with documented guidelines and procedures and must not be used for any other purpose To provide full redundancy and concurrent maintenance SAN Volume Controllers...

Страница 30: ...east twice For a fully charged uninterruptible power supply even after battery capacity has been used to power the SAN Volume Controllers while they save DRAM data sufficient battery capacity will rem...

Страница 31: ...cs v Uninterruptible power supply requirements on page xv Controls and indicators for the uninterruptible power supply All the controls for the uninterruptible power supply are contained on the front...

Страница 32: ...uptible power supply output sockets When the mode indicator is steady red the uninterruptible power supply is in bypass mode because of one of the following conditions v The uninterruptible power supp...

Страница 33: ...ply on page 9 Test and alarm reset button Use the test and alarm reset button 4 to start the self test To start the self test press and hold the button for three seconds This button also resets the al...

Страница 34: ...ery five seconds When main power returns the uninterruptible power supply returns to normal mode and the battery recharges The battery mode indicator goes out and the alarm stops Related topics v Cont...

Страница 35: ...including SAN topology rendering SNMP trap management Call Home Service Alert and Remote Service facilities as well as all the configuration and diagnostic utilities for the components Note VPN connec...

Страница 36: ...14 Installation Guide...

Страница 37: ...h the customer that it is safe for you to proceed Go no further with these instructions until you are satisfied that all the information is correct and valid Related topics v IBM TotalStorage SAN Volu...

Страница 38: ...ling the support rails and the SAN Volume Controller into a rack on page 26 Installing the support rails for the uninterruptible power supply Before you can install the uninterruptible power supply yo...

Страница 39: ...ou are going to install the uninterruptible power supply see Figure 19 An uninterruptible power supply must always be installed into the lowest available position in the rack The only device that can...

Страница 40: ...e support rail flange Fully tighten the screws i Fully tighten the two wing nuts 2 j Loosen the wing nut 3 and slide the bracket toward the front of the rail as far as it will go with the front edge o...

Страница 41: ...oving it from the shipping carton Perform the following steps to remove the battery assembly a Open the top of the uninterruptible power supply shipping carton and then with the assistance of another...

Страница 42: ...side Note The cover for the uninterruptible power supply is not installed however it is included in the box with the uninterruptible power supply Install the front cover after you have completed the...

Страница 43: ...of the rack and with aid from another service representative place the back of the uninterruptible power supply onto the support rails then slide the uninterruptible power supply into the rack 6 Insta...

Страница 44: ...ugh the input line power cord you are usually not required to use this additional grounding screw feature 8 At the back of the uninterruptible power supply plug the uninterruptible power supply main p...

Страница 45: ...ort time while the uninterruptible power supply runs a self test When the test is complete the mode indicator 1 flashes to show that the uninterruptible power supply is in standby mode see Figure 26 P...

Страница 46: ...e installation ensure that you review and complete all of the safety checks detailed in the documentation for the master console the keyboard and the display Ensure that the customer has all of the in...

Страница 47: ...ter console IP address provided by the customer complete the following steps a Right click the My Network Places icon and select Properties b Right click the Local Area Connection 2 option and select...

Страница 48: ...e Controller and installing the SAN Volume Controller into a rack Installing the support rails for the SAN Volume Controller The following task describes how to install the support rails for the SAN V...

Страница 49: ...lever engages a hole in the back bracket assembly and holds the latch lock carrier in the retracted position 7 Push the back rail bracket 1 Figure 29 on page 28 toward the front of the rail until it s...

Страница 50: ...tch lock carrier for approximately 13 mm 0 5 in The latch lever engages in a hole in the back bracket assembly and holds the latch lock carrier in the retracted position 11 Place the front end of the...

Страница 51: ...ides toward the rear of the rack and the locating pins project through the holes that are in the rear flange and in the rear rail bracket Important Ensure that the locating pins are fully extended thr...

Страница 52: ...upply This task includes the steps you complete to connect the SAN Volume Controller to the uninterruptible power supply Each SAN Volume Controller of a pair should be connected to a different uninter...

Страница 53: ...to identify the uninterruptible power supply to which this SAN Volume Controller is to be connected Steps Perform the following steps to connect the SAN Volume Controller to the uninterruptible power...

Страница 54: ...lume Controller to the SAN and to the Ethernet network 1 Attention You must use only Ethernet port 1 on the SAN Volume Controller The software is configured only for Ethernet port 1 Connect the Ethern...

Страница 55: ...ess bar is displayed in line 2 of the front panel display Battery charging can take up to 3 hours until the battery is fully charged When the battery is charged enough Cluster is displayed in line 1 o...

Страница 56: ...e left or right button to display the other port options Check whether for each port line 2 of the display shows the message Active If Active is not shown for any port go to MAP 5600 Fibre channel to...

Страница 57: ...r can now begin to create clusters and perform other configuration tasks See the IBM TotalStorage SAN Volume Controller Configuration Guide for detailed configuration instructions Chapter 4 Installing...

Страница 58: ...36 Installation Guide...

Страница 59: ...ailed v Hardware boot v Node rescue request v Power failure v Powering off v Restarting v Shutting down v Error codes Related topics v Boot failed on page 38 v Hardware boot on page 38 v Node rescue r...

Страница 60: ...ume Controller nodes This software includes the operating system the application software and the SAN Volume Controller publications It is not normally necessary to replace the software on a node but...

Страница 61: ...ogress bar continues to move backward until the node finishes saving its data After the data is saved the progress bar moves forward during the restart operation Shutting down Figure 45 on page 40 is...

Страница 62: ...ed on line 2 The first option displayed is the cluster option Use the Left and Right buttons to navigate through the secondary fields that are associated with some of the main fields Note Sometimes a...

Страница 63: ...icates that this SAN Volume Controller is an active member of the cluster Inactive Indicates that the SAN Volume Controller is a member of a cluster but is not now operational It is not operational ei...

Страница 64: ...of the node as follows Properties Active The SAN Volume Controller is operational and assigned to a cluster It has access to the fibre channel fabric Inactive The SAN Volume Controller is operational...

Страница 65: ...uster option press the select button The IP address option displays 2 Press the select button again The first IP address number is highlighted 3 Press the up button if you want to increase the value t...

Страница 66: ...is highlighted 2 Press the up button if you want to increase the value that is displayed press the down button if you want to decrease that value If you want to quickly increase or decrease the value...

Страница 67: ...manage the configuration and service interface The possible states of the Ethernet port are as follows Properties Active The cluster is accessible through this port Inactive The port is operational b...

Страница 68: ...following languages are available v English v French v German v Italian v Japanese v Korean v Portuguese v Spanish v Chinese simplified v Chinese traditional If you do not understand the language that...

Страница 69: ...ents Power Supply Assembly Type Voltage Frequency 220 V 88 to 264 V ac 47 to 63 Hz Environment Environment Temperature Altitude Relative humidity Maximum wet bulb temperature Operating 10 C to 35 C 50...

Страница 70: ...lied must be between 50 and 60 Hz Note If the uninterruptible power supply is cascaded from another uninterruptible power supply the source uninterruptible power supply must have at least 3 times the...

Страница 71: ...eets the installation requirements for the master console server and console monitor kit Server dimensions and weight Height Width Depth Approximate Maximum Weight 43 mm 1 7 in 430 mm 16 69 in 424 mm...

Страница 72: ...ut Approximate heat output in British thermal units BTU per hour v Minimum configuration 87 watts 297 BTU v Maximum configuration 150 watts 512 BTU Monitor console kit dimensions and weight Height Wid...

Страница 73: ...board by using the following key combinations v To traverse to the next link button or topic press Tab inside a frame page v To expand or collapse a tree node press or respectively v To move to the ne...

Страница 74: ...52 Installation Guide...

Страница 75: ...HER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of express or imp...

Страница 76: ...ts used in daily business operations To illustrate them as completely as possible the examples include the names of individuals companies brands and products All of these names are fictitious and any...

Страница 77: ...ed cables and connectors or by unauthorized changes or modifications to this equipment Unauthorized changes or modifications could void the user s authority to operate the equipment This device compli...

Страница 78: ...opean Union EU statement This product is in conformity with the protection requirements of EU council directive 89 336 EEC on the approximation of the laws of the Member States relating to electromagn...

Страница 79: ...Dieses Genehmigungsverfahren ist nach Paragraph 9 EMVG in Verbindung mit der entsprechenden Kostenverordnung Amtsblatt 14 93 kostenpflichtig Nach der EN 55022 Dies ist eine Einrichtung der Klasse A D...

Страница 80: ...58 Installation Guide...

Страница 81: ...r tape cluster In SAN Volume Controller a pair of nodes that provides a single configuration and service interface CIM See Common Information Model Common Information Model CIM A set of standards deve...

Страница 82: ...N Volume Controller those storage area network SAN components such as switches and cables that connect the components nodes hosts switches of the local cluster together logical unit LU An entity to wh...

Страница 83: ...and power surges The uninterruptible power supply contains a power sensor to monitor the supply and a battery to provide power until an orderly shutdown of the system can be performed V valid configu...

Страница 84: ...62 Installation Guide...

Страница 85: ...E electrical input 49 electrical requirements 47 uninterruptible power supply 48 electronic emission notices 55 European Union EU 56 Federal Communications Commission FCC 55 French Canadian 56 German...

Страница 86: ...Controller 47 publications ordering vii R recovery cluster menu option 42 recycling product xviii related information v requirements uninterruptible power supplies xv S safety caution notices viii x...

Страница 87: ...his book is Very Satisfied Satisfied Neutral Dissatisfied Very Dissatisfied Accurate h h h h h Complete h h h h h Easy to find h h h h h Easy to understand h h h h h Well organized h h h h h Applicabl...

Страница 88: ...opment Department 61C 9032 South Rita Road Tucson Arizona USA 85775 4401 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _...

Страница 89: ......

Страница 90: ...Part Number 64P8120 Printed in USA SC26 7541 02 1P P N 64P8120...

Страница 91: ...Spine information IBM TotalStorage SAN Volume Controller Installation Guide Version 1 2 0...

Отзывы: