
Step 1542-23
1. Turn off the power.
2. At the primary I/O book, disconnect the cable connection at RIO port B0 (U1.18-P1-H2/Q3).
3. Disconnect the cable connection at I/O subsystem 2 left I/O port connector 0 (U1.5-P1/Q2). The RIO
cable that was connected to RIO port B0 should now be loose and can be removed.
4. At the primary I/O book, disconnect the cable connection at RIO port B1 (U1.18-P1-H2/Q4) and
reconnect it to RIO port B0 (U1.18-P1-H2/Q3).
5. Disconnect the cable connection at I/O subsystem 2 right I/O port connector 1 (U1.5-P2/Q1) and
reconnect it to I/O subsystem 2 left I/O port connector 0 (U1.5-P1/Q2).
6. Verify that processor subsystem RIO port B0 on primary I/O book (U1.18-P1-H2/Q3) is connected to
I/O subsystem 2 left I/O port connector 0 (U1.5-P1/Q2).
7. Verify that I/O subsystem 2 left I/O port connector 1 (U1.5-P1/Q1) is connected to I/O subsystem 2
right I/O port connector 0 (U1.5-P2/Q2).
8. Turn on the power to boot standalone diagnostics from CD.
9. If the
Please define the System Consol
e screen is displayed, follow directions to select the system
console.
10. Use the Display Configuration and Resource List to list all attached devices and adapters (refer to the
RS/6000 and
Eserver
pSeries Diagnostic Information for Multiple Bus Systems
, order number
SA38-0509, if necessary).
11. Check that all attached devices and adapters are listed.
Did the Please define the System Console screen display and are all attached devices and adapters
listed?
NO
Connect the previously removed RIO cable from I/O subsystem 2 right I/O port connector 1
(U1.5-P2/Q1) to processor subsystem RIO port B1 on primary I/O book (U1.18-P1-H2/Q4). Go to
“Step 1542-9” on page 267.
YES
The RIO cable that was removed in step number 3 above is defective. Replace the RIO cable.
Connect the new RIO cable from I/O subsystem 2 right I/O port connector 1 (U1.5-P2/Q1) to
processor subsystem RIO port B1 on primary I/O book (U1.18-P1-H2/Q4). Reconfigure the system
to its original condition. Go to “MAP 0410: Repair Checkout” in the
RS/6000 and
Eserver
pSeries
Diagnostic Information for Multiple Bus Systems
.
Chapter 3. Maintenance Analysis Procedures
273
Содержание pSeries 670
Страница 1: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Страница 2: ......
Страница 3: ...pSeries 670 Service Guide SA38 0615 03 ERserver...
Страница 12: ...x Eserver pSeries 670 Service Guide...
Страница 16: ...xiv Eserver pSeries 670 Service Guide...
Страница 18: ...xvi Eserver pSeries 670 Service Guide...
Страница 256: ...Make sure all the green power good out LEDs of both I O subsystem DCAs are off 236 Eserver pSeries 670 Service Guide...
Страница 324: ...Yes Go to Step 154A 14 on page 302 304 Eserver pSeries 670 Service Guide...
Страница 718: ...698 Eserver pSeries 670 Service Guide...
Страница 828: ...number 8 Exit the menu completely before powering on the system 808 Eserver pSeries 670 Service Guide...
Страница 835: ...MCM Installation Shorts Test Step 3 See L3 Cache Modules on page 819 Chapter 9 Removal and Replacement Procedures 815...
Страница 848: ...L3 Cache Shorts Test Step 4 828 Eserver pSeries 670 Service Guide...
Страница 849: ...L3 Cache Shorts Test Step 5 Chapter 9 Removal and Replacement Procedures 829...
Страница 851: ...L3 Cache Shorts Test Step 2 Chapter 9 Removal and Replacement Procedures 831...
Страница 853: ...L3 Cache Shorts Test Step 4 Chapter 9 Removal and Replacement Procedures 833...
Страница 854: ...L3 Cache Shorts Test Step 5 834 Eserver pSeries 670 Service Guide...
Страница 971: ...7040 Model 671 Media Subsystem 1 2 3 4 5 6 7 8 9 10 Chapter 10 Parts Information 951...
Страница 973: ...Power and SCSI Cables to the Media Subsystem 1 2 3 5 4 6 Chapter 10 Parts Information 953...
Страница 986: ...966 Eserver pSeries 670 Service Guide...
Страница 990: ...970 Eserver pSeries 670 Service Guide...
Страница 1005: ...error Handle unexpected modem responses expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations 985...
Страница 1018: ...998 Eserver pSeries 670 Service Guide...
Страница 1019: ...Appendix E Ground Path The ground path for the pSeries 670 is shown in the following figure 999...
Страница 1020: ...1000 Eserver pSeries 670 Service Guide...
Страница 1028: ...1008 Eserver pSeries 670 Service Guide...
Страница 1031: ......
Страница 1032: ...Printed in U S A July 2003 SA38 0615 03...