1
Rear
Cutout
4
Cable
Management
Backet
2
Extender
5
Stiffener
3
Tailgate
Insert
Cable
Installation
Procedure,
Initial
Setup
Note:
Do
not
connect
any
switch
cables
to
the
nodes
until
instructed
to
do
so.
1.
Place
the
frame
in
position
over
the
floor
tile
cutouts
v
If
the
frame
has
10
or
more
nodes
installed,
the
movers
will
position
the
frame
2.
Install
the
frame
using
the
appropriate
installation
instructions
3.
Verify
that
the
cable
management
bracket
is
properly
installed
on
the
base
at
the
rear
of
the
frame,
if
not:
a.
Remove
orange
shipping
bracket
from
the
rear
of
the
frame
b.
Install
the
stiffener
into
the
rear
cutout
on
the
base
of
the
frame
Figure
1.
Cable
management
bracket
installation
162
Eserver
pSeries
655
Installation
Guide
Содержание pseries 655
Страница 1: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Страница 2: ......
Страница 3: ...pSeries 655 Installation Guide SA38 0616 03 ERserver...
Страница 14: ...xii Eserver pSeries 655 Installation Guide...
Страница 22: ...6 Eserver pSeries 655 Installation Guide...
Страница 54: ...38 Eserver pSeries 655 Installation Guide...
Страница 101: ...2 1 1 Top of Cassette 2 Handle Chapter 4 Installation and Removal Procedures 85...
Страница 125: ...1 Metal EMC Shield 2 Adapter Bracket Chapter 4 Installation and Removal Procedures 109...
Страница 128: ...112 Eserver pSeries 655 Installation Guide...
Страница 132: ...116 Eserver pSeries 655 Installation Guide...
Страница 156: ...140 Eserver pSeries 655 Installation Guide...
Страница 204: ...188 Eserver pSeries 655 Installation Guide...
Страница 211: ......
Страница 212: ...Part Number 80P3836 Printed in USA February 2004 SA38 0616 03 1P P N 80P3836...