Use the following steps to prepare your raised floor:
1.
Cut the following openings in the raised floor for each rack that uses an
Earthquake Resistance Kit:
v
Four holes for the rubber bushings of the kit to fit through the floor
v
One cable cutout for power and other cables that connect to the rack
Use Figure 24 on page 156 as a guide for the location and dimensions of these
openings.
Figure 23. Earthquake Resistance Kit, as installed on a raised floor
Chapter 6. Meeting DS8000 series delivery and installation requirements
155
Содержание DS8700
Страница 1: ...IBM System Storage DS8800 and DS8700 Version 6 Release 3 Introduction and Planning Guide GC27 2297 09...
Страница 2: ......
Страница 3: ...IBM System Storage DS8800 and DS8700 Version 6 Release 3 Introduction and Planning Guide GC27 2297 09...
Страница 8: ...vi Introduction and Planning Guide...
Страница 10: ...viii Introduction and Planning Guide...
Страница 20: ...xviii Introduction and Planning Guide...
Страница 22: ...xx Introduction and Planning Guide...
Страница 44: ...22 Introduction and Planning Guide...
Страница 142: ...120 Introduction and Planning Guide...
Страница 160: ...138 Introduction and Planning Guide...
Страница 212: ...190 Introduction and Planning Guide...
Страница 218: ...196 Introduction and Planning Guide...
Страница 224: ...202 Introduction and Planning Guide...
Страница 242: ...220 Introduction and Planning Guide...
Страница 254: ...232 Introduction and Planning Guide...
Страница 255: ......
Страница 256: ...Printed in USA GC27 2297 09...