this feature are given in Figure 21. See “Overhead cable management (top exit)” on
page 143 for critical safety, service, and installation considerations for this feature.
The following notes provide information about the labeled components in
Figure 21:
1
Top exist bracket for Fibre cables
2
Top exit cable channel bracket
Meeting floor load requirements
It is important for your location to meet floor load requirements.
Use the following steps to ensure that your location meets the floor load
requirements and to determine the weight distribution area required for the floor
load:
1
2
14 (0.6)
270 (10.6)
61 (2.4)
209 (8.2)
585 (23.0)
33 (1.3)
53 (2.1)
274 (10.8)
f2c01681
Front
Rear
Figure 21. Measurements for DS8000 placement with top exit bracket feature present
148
Introduction and Planning Guide
Содержание DS8700
Страница 1: ...IBM System Storage DS8800 and DS8700 Version 6 Release 3 Introduction and Planning Guide GC27 2297 09...
Страница 2: ......
Страница 3: ...IBM System Storage DS8800 and DS8700 Version 6 Release 3 Introduction and Planning Guide GC27 2297 09...
Страница 8: ...vi Introduction and Planning Guide...
Страница 10: ...viii Introduction and Planning Guide...
Страница 20: ...xviii Introduction and Planning Guide...
Страница 22: ...xx Introduction and Planning Guide...
Страница 44: ...22 Introduction and Planning Guide...
Страница 142: ...120 Introduction and Planning Guide...
Страница 160: ...138 Introduction and Planning Guide...
Страница 212: ...190 Introduction and Planning Guide...
Страница 218: ...196 Introduction and Planning Guide...
Страница 224: ...202 Introduction and Planning Guide...
Страница 242: ...220 Introduction and Planning Guide...
Страница 254: ...232 Introduction and Planning Guide...
Страница 255: ......
Страница 256: ...Printed in USA GC27 2297 09...