• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging
and installing or replacing hardware, touch an unpainted metal surface of the system for a
minimum of 5 seconds. If at any point in this service process you move away from the
system, it is important to again discharge yourself by touching an unpainted metal surface
for at least 5 seconds before you continue with the service process.
2. Unlock the drive bay handle (B) by pushing in the handle release (A) as shown in the following figure.
The handle (B) snaps out towards you. If the handle does not snap out all the way, the drive does not
slide out of the system.
Figure 11. Removing a front drive
3. If you are installing more than one drive, remove those drive trays.
4. For 3.5-inch drives, remove the plastic filler from the carrier. For 2.5-inch drives in a 3.5-inch
opening, a 2.5-inch tool-less drive carrier exists.
5. Install a drive into the tray.
Orient the drive such that the connectors are pointing to the rear of the drive.
• A 3.5-inch drive fills the tray, as shown in Figure 12 on page 15. Fasten the drive to the sides of
the tray with four screws (two screws on each side).
14 Power Systems: Installing and configuring the IBM Power System LC922 (9006-22P)
Содержание 9006-22C
Страница 1: ...Power Systems Installing and configuring the IBM Power System LC922 9006 22P IBM...
Страница 14: ...xiv Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 112: ...98 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 120: ...or or or 106 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 136: ...122 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 147: ......
Страница 148: ...IBM...