Figure 22. Single-processor plugging sequence
Installing memory in the 9006-22P system
Learn how to install memory in the IBM Power System LC922 (9006-22P) system.
Before you begin
Power off the system and place it in the service position. For instructions, see “Preparing the 5104-22C,
9006-22C, or 9006-22P system to remove and replace internal parts” on page 105.
Procedure
1. Attach the electrostatic discharge (ESD) wrist strap.
The ESD wrist strap must be connected to an unpainted metal surface until the service procedure is
completed, and if applicable, until the service access cover is replaced.
Attention:
• Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack,
or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from
damaging your hardware.
• When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is
used for static control. It does not increase or decrease your risk of receiving electric shock
when using or working on electrical equipment.
• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging
and installing or replacing hardware, touch an unpainted metal surface of the system for a
minimum of 5 seconds. If at any point in this service process you move away from the system,
it is important to again discharge yourself by touching an unpainted metal surface for at least
5 seconds before you continue with the service process.
2. Determine the slot in which you want to install the memory. See “Placement rules for memory in the
9006-12P or 9006-22P system” on page 26 to understand the plugging rules and to ensure that you
plug the memory into the system in the correct sequence.
28 Power Systems: Installing and configuring the IBM Power System LC922 (9006-22P)
Содержание 9006-22C
Страница 1: ...Power Systems Installing and configuring the IBM Power System LC922 9006 22P IBM...
Страница 14: ...xiv Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 112: ...98 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 120: ...or or or 106 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 136: ...122 Power Systems Installing and configuring the IBM Power System LC922 9006 22P...
Страница 147: ......
Страница 148: ...IBM...