Interpreting the BOOT results
persistently disable the POST. The success or failure results of the diagnostic tests that run during
POST can be monitored through LED activity, the error log, or the command line interface. During the
POST, the LEDs flash different colors.
The POST includes the following tasks:
• Conducts preliminary POST diagnostics.
• Initializes the operating system.
• Initializes hardware.
• Runs diagnostic tests on several functions, including circuitry, port functionality, memory, statistics
counters, and serialization.
Perform the following steps to determine whether POST completed successfully and whether any
errors were detected.
1. Verify that the LEDs on the device indicate that all components are healthy. If one or more LEDs do
not display a healthy state:
a) Verify that the LEDs are not set to "beacon" (this can be determined through the
switchShow
command or Web Tools).
b) Follow the recommended action for the observed LED behavior.
2. Verify the
diagShow
command displays that the diagnostic status for all ports in the device is OK.
3. Review the system log for errors. Errors detected during POST are written to the system log, which
can be viewed by using the
errShow
command.
Interpreting the BOOT results
BOOT includes the following tasks after POST is complete.
1. Performs universal port configuration.
2. Initializes links.
3. Analyzes the fabric. If any ports are connected to other switches, the switch participates in a fabric
configuration.
4. Obtains a domain ID and assigns port addresses.
5. Constructs unicast routing tables.
6. Enables normal port operation.
Running diagnostic tests
In addition to the POST, Fabric OS includes diagnostic tests to help you troubleshoot the hardware
and firmware. This includes tests of internal connections and circuitry, fixed media, and the
transceivers and cables in use.
The tests are implemented by command, either through a Telnet session or through a terminal set up
for a serial connection to the device. Some tests require the ports to be connected by external cables
to allow diagnostics to verify the serializer/deserializer interface, transceiver, and cable. Some tests
require loopback plugs.
Diagnostic tests are run at supported link speeds depending on the speed of the link being tested and
the type of port.
72
Hardware Installation Guide
Содержание 8960-F64
Страница 1: ...IBM 64 Port 32G Gen 6 Switch 8960 F64 8960 N64 Hardware Installation Guide...
Страница 5: ...6 Hardware Installation Guide...
Страница 9: ...Hardware Installation Guide 11...
Страница 10: ...What s new in this document 12 Hardware Installation Guide...
Страница 22: ...Shipping carton contents 24 Hardware Installation Guide...
Страница 48: ...Attaching the rear brackets to the device 50 Hardware Installation Guide...
Страница 64: ...Verifying the operation of new transceivers 66 Hardware Installation Guide...
Страница 72: ...Running diagnostic tests 74 Hardware Installation Guide...
Страница 100: ...Danger Notices 102 Hardware Installation Guide...