Flush-front mounting
1
Front brackets (2)
2
Rear brackets, 3-5 inch post (2)
3
Rear brackets, 5-6 inch post (2)
4
Screw, 8-32 x 5/16-in., panhead Phillips
(8)
5
Screw, 8-32 x 5/16-in., flathead Phillips
(16)
6
Screw, 6-32 x 1/4-in., panhead Phillips
(8)
7
Screw, 10-32 x 5/8-in., panhead Phillips
(8)
8
Retainer nut, 10-32 (8)
FIGURE 15
Items in the Universal Two-Post Rack Kit
NOTE
Use the screws specified for use with the device. Longer screws can damage the device.
Ensure that the items listed and illustrated in
Figure 15
are included in the kit. Note that not all parts
may be used with certain installations depending on the device type.
Flush-front mounting
Observe the following notes when using this procedure:
• The device must be turned off and disconnected from the fabric during this procedure.
• The illustrations in this document show a 1U device, but the instructions are the same for a 2U
device.
• The illustrations for this procedure show a two-post rack with narrow posts (3- to 5-inch) as an
example.
Complete the following tasks to install the device in a rack:
1.
Attaching the front brackets to the device
on page 42
2.
Attaching the front brackets to the rack
on page 42
Hardware Installation Guide
41
Содержание 8960-F64
Страница 1: ...IBM 64 Port 32G Gen 6 Switch 8960 F64 8960 N64 Hardware Installation Guide...
Страница 5: ...6 Hardware Installation Guide...
Страница 9: ...Hardware Installation Guide 11...
Страница 10: ...What s new in this document 12 Hardware Installation Guide...
Страница 22: ...Shipping carton contents 24 Hardware Installation Guide...
Страница 48: ...Attaching the rear brackets to the device 50 Hardware Installation Guide...
Страница 64: ...Verifying the operation of new transceivers 66 Hardware Installation Guide...
Страница 72: ...Running diagnostic tests 74 Hardware Installation Guide...
Страница 100: ...Danger Notices 102 Hardware Installation Guide...