Lifting requirements
TABLE 7
Space requirements
Chassis with
port-side side
vents
Notes
Chassis depth Minimum rack depth Maximum rack depth
No
Applicable to port-side and
nonport-side flush mounts.
L
L-12.7 cm (L-5 in.)
81.28 cm (32 in.)
Yes
Applicable to port-side flush
mounts.
L
L-12.7 cm (L-5 in.)
81.28 cm (32 in.)
Yes
Applicable to nonport-side
flush mounts.
L
L
81.28 cm (32 in.)
Note that if chassis depth (L) is less than 40.64 cm (16 in.), the chassis will not fit into a rack with a
maximum depth of 81.28 cm (32 in.) using the universal four-post rack kit. The maximum rack depth for
a chassis less than 40.64 cm (16 in.) is 81.28 cm (32 in.) minus the difference between the chassis
depth and 40.64 cm (16 in.). For example, a chassis with a depth (L) of 35.56 cm (14 in.) is 5.08 cm (2
in.) smaller than 40.64 cm (16 in.), so it will install into a rack with a maximum depth of 81.28 cm (32 in.)
- 5.08 cm (2 in.) = 76.2 cm (30 in.).
• Verify that the additional weight of the device does not exceed the rack weight limits.
• Ensure that an electrical branch circuit with the following characteristics is available:
‐
Required voltage and frequency as indicated in the Technical Specifications (200-240 VAC is
always preferred).
‐
Protection by a circuit breaker in accordance with local electrical codes.
‐
Supply circuit, line fusing, and wire size that conform to the electrical rating on the device
nameplate.
‐
Grounded outlet compatible with the power cord and installed by a licensed electrician.
• Ensure that all equipment installed in the rack is grounded through a reliable branch circuit
connection. Do not rely on a secondary connection to a branch circuit, such as a power strip.
• Ensure that the rack is mechanically secured to ensure stability.
• Ensure that the air temperature at the fan inlet is less than 40
o
C (104
o
F) during device operation.
• Ensure that the airflow available at the air vents meets the minimum requirements for the device.
NOTE
Install the device with the airflow aligned with any other devices in the rack. Some devices have airflow
running from port side to fan side and others have the opposite arrangement. Make sure that the airflow
for all devices moves in the same direction to maximize cooling.
Lifting requirements
For 1U and 2U devices, two people are required to install the device in a rack. One person holds the
device, while the other screws in the front and rear "L" brackets.
Time and items required
Allow 15 to 30 minutes to complete the installation.
The following items are required to install the device using the Universal Four-Post Rack Kit:
Hardware Installation Guide
27
Содержание 8960-F64
Страница 1: ...IBM 64 Port 32G Gen 6 Switch 8960 F64 8960 N64 Hardware Installation Guide...
Страница 5: ...6 Hardware Installation Guide...
Страница 9: ...Hardware Installation Guide 11...
Страница 10: ...What s new in this document 12 Hardware Installation Guide...
Страница 22: ...Shipping carton contents 24 Hardware Installation Guide...
Страница 48: ...Attaching the rear brackets to the device 50 Hardware Installation Guide...
Страница 64: ...Verifying the operation of new transceivers 66 Hardware Installation Guide...
Страница 72: ...Running diagnostic tests 74 Hardware Installation Guide...
Страница 100: ...Danger Notices 102 Hardware Installation Guide...