Blade
Server
worksheet
Fill
out
one
worksheet
for
each
blade
server
that
is
being
installed;
up
to
14
for
each
BladeCenter
unit.
The
following
factors
drive
the
choices
you
make
when
filling
out
a
blade
server
worksheet:
1.
What
applications
will
this
server
provide?
2.
Which
operating
system
will
the
server
use?
3.
What
are
my
redundancy
requirements
for
this
server?
Redundancy
is
handled
at
multiple
levels:
v
Blade
server
level
–
a
mirror
image
blade
server
that
resides
in
the
same
BladeCenter
unit
or
in
a
different
BladeCenter
unit.
v
BladeCenter
level
–
a
mirror
image
BladeCenter
unit
that
resides
in
the
same
rack
or
in
a
different
rack.
v
Rack
level
–
a
set
of
BladeCenter
units
in
a
rack
that
mirrors
a
set
of
BladeCenter
units
in
a
different
rack.
4.
What
are
the
network
connectivity
requirements
for
this
server,
including
physical
connectivity
for
a
redundant
path?
How
to
fill
out
this
worksheet:
1.
Record
the
name
and
purpose
of
this
server.
2.
Select
one
of
the
following
operating
systems,
and
record
it
on
the
worksheet:
v
Windows
v
Linux
3.
Select
an
installation
option
for
the
operating
system.
4.
Record
the
applications
for
this
server.
5.
Chose
which
internal
Ethernet
switch
module
this
server
uses;
circle
1
or
2.
6.
Select
DHCP
or
record
static
IP
address
information.
(The
host
name
can
be
up
to
63
characters.)
7.
Circle
the
number
of
the
BladeCenter
bay
location
for
this
blade
server.
Note:
If
this
server
has
a
SCSI
Storage
Expansion
option,
circle
two
adjacent
BladeCenter
bay
locations
8.
Circle
a
BladeCenter
chassis
number.
This
should
match
the
location
of
the
BladeCenter
unit
in
the
rack.
For
example,
BladeCenter
number
1
should
be
installed
in
the
bottom
of
the
rack.
Location
1
uses
U1
to
U7
Location
2
uses
U8
to
U14
Location
3
users
U15
to
U21
Location
4
uses
U22
to
U28
Location
5
user
U29
to
U35
Location
6
uses
U36
to
U42
9.
Record
the
number
and
physical
location
of
the
rack.
10.
Select
either
the
2.0
GHz
or
the
2.4
GHz
blade
server
chassis.
11.
For
the
remainder
of
the
worksheet,
select
the
components
of
this
server,
processors,
memory,
and
so
forth.
Compute
the
weight
for
each
component
and
record
it
on
the
worksheet.
At
the
bottom
of
the
worksheet,
record
the
total
weight
for
this
blade
server.
This
information
is
needed
for
the
“8677
BladeCenter
worksheet”
on
page
88.
86
BladeCenter
Type
8677:
Planning
and
Installation
Guide
Содержание 8677 - BladeCenter Rack-mountable - Power...
Страница 1: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Страница 2: ......
Страница 3: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Страница 6: ...iv BladeCenter Type 8677 Planning and Installation Guide...
Страница 10: ...viii BladeCenter Type 8677 Planning and Installation Guide...
Страница 94: ...84 BladeCenter Type 8677 Planning and Installation Guide...
Страница 122: ...112 BladeCenter Type 8677 Planning and Installation Guide...
Страница 125: ......
Страница 126: ...Printed in USA GA27 4327 01...