v
Assign
a
Priority
to
each
port
within
a
group
(priority
can
be
the
same
for
all
ports)
v
Assign
an
Operator
Key
to
each
port.
LACP
can
be
used
only
if
both
stations
sharing
the
link
support
the
802.3AD
Link
Aggregation
Protocol.
Blade
server
configuration
planning
Use
the
information
provided
in
this
section
along
with
the
worksheet
provided
(see
“Management
module
configuration
worksheet”
on
page
95)
to
plan
for
the
configuration
of
the
blade
server.
In
addition,
more
information
about
the
blade
server
is
provided
in
the
IBM
BladeCenter
Type
8677
HS20
Installation
and
User’s
Guide
.
You
can
configure
the
following
options
for
each
blade
server:
v
Enable
or
disable
the
IDE
and
Ethernet
controllers.
If
you
select
disable,
the
system
will
not
configure
the
disabled
device,
and
the
operating
system
will
not
detect
the
device
(this
is
the
equivalent
of
unplugging
the
device).
v
If
you
disable
the
on-board
IDE
controller
and
no
other
controller
and
mass
storage
device
are
installed,
operating-system
startup
cannot
occur.
v
Specify
a
system
date
and
time.
You
can
specify
a
time
to
be
added
or
subtracted
from
the
system
time
that
is
sent
to
the
system-management
processor
each
time
the
blade
server
is
started.
If
you
want
the
system
clock
time
to
be
the
same
as
the
system-management
processor
clock
time,
leave
the
value
set
at
its
default
of
0.
v
Power-on
password.
You
can
use
any
combination
of
up
to
seven
alphanumeric
characters
(A-Z,
a-z,
and
0–9)
for
the
password.
Note:
To
use
the
CD-ROM
drive
or
diskette
drive
as
a
boot-record
source
for
a
blade,
the
blade
must
be
designated
as
the
owner
of
the
CD-ROM
drive,
diskette
drive,
and
USB
port.
See
the
BladeCenter
Type
8677
Installation
and
User’s
Guide
for
more
information
about
specifying
ownership.
Chapter
5.
Configuration
considerations
83
Содержание 8677 - BladeCenter Rack-mountable - Power...
Страница 1: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Страница 2: ......
Страница 3: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Страница 6: ...iv BladeCenter Type 8677 Planning and Installation Guide...
Страница 10: ...viii BladeCenter Type 8677 Planning and Installation Guide...
Страница 94: ...84 BladeCenter Type 8677 Planning and Installation Guide...
Страница 122: ...112 BladeCenter Type 8677 Planning and Installation Guide...
Страница 125: ......
Страница 126: ...Printed in USA GA27 4327 01...