–
Each
switch
module
–
Each
processor
blade
(blade
server)
v
You
have
obtained
a
gateway
IP
address
and
subnet
mask
(if
needed).
Follow
these
steps
to
deploy
and
configure
your
BladeCenter
unit
using
IBM
Director
(but
without
a
DHCP
server):
1.
Plug
in
the
Blade
Server
and
check
the
LED
status.
2.
From
IBM
Director,
set
Chassis
Association
and
select
the
Chassis
&
Chassis
Members
group
view.
3.
Initiate
chassis
discovery.
The
BladeCenter
managed
object
appears
on
the
IBM
Director
console.
4.
Right-click
the
BladeCenter
managed
object
and
select
Request
access
.
5.
Enter
a
valid
user
ID
and
password
for
the
management
module.
The
default
user
ID
is
USERID
and
the
default
password
is
PASSW0RD
(numeric
0
and
not
uppercase
O).
6.
The
BladeCenter
managed
object
and
the
associated
processor
blades
appear
on
the
IBM
Director
console.
7.
Verify
that
the
processor
blade
object
matches
the
actual
blade.
Note:
Turn
on
the
BladeCenter
BlueLight
to
identify
the
BladeCenter
unit
you
are
managing.
8.
Configure
the
BladeCenter
management
module.
Select
the
MPA
ServerBlade
management
task
and
drag-and-drop
the
task
on
the
BladeCenter
managed
object.
9.
Configure
the
management
module.
a.
Enter
a
static
IP
address
for
NIC
1
if
desired.
b.
Enter
a
static
IP
address
for
NIC
2
(in
same
subnet
as
NIC
1).
When
prompted
to
reboot
the
management
module,
click
Yes.
10.
After
the
management
module
has
rebooted,
complete
the
configuration
of
the
management
module.
Note:
Changes
you
make
during
configuration,
such
as
changing
the
management
module
name,
will
not
automatically
appear
on
the
IBM
Director
console.
11.
Change
the
user
ID
and
password
for
the
management
module.
12.
Set
the
BladeCenter
policies.
Because
you
are
managing
the
BladeCenter
from
IBM
Director,
you
should
disable
local
power
control,
local
keyboard/video/mouse
(KVM)
switching,
and
local
USB
media
switching.
13.
Configure
each
switch
in
the
chassis,
which
you
can
perform
from
the
ServerBlade
Management
task.
a.
Set
the
IP
address,
subnet
mask,
and
hostname
(if
applicable).
Note:
You
must
make
sure
that
the
IP
address
used
for
the
switch
is
on
the
same
subnet
as
the
external
IP
address
for
the
management
module
if
you
intend
to
manage
the
switch
through
the
management
module.
b.
Click
the
button
to
launch
a
Web
browser
to
start
the
embedded
switch
configuration
task.
You
must
have
IP
connectivity
between
the
console
and
the
switch.
c.
Make
sure
you
enable
SNMP
trap
forwarding
to
the
IP
address
of
the
IBM
Director
server.
Chapter
3.
Deployment
considerations
35
Содержание 8677 - BladeCenter Rack-mountable - Power...
Страница 1: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Страница 2: ......
Страница 3: ...BladeCenter Type 8677 Planning and Installation Guide GA27 4327 01 ERserver...
Страница 6: ...iv BladeCenter Type 8677 Planning and Installation Guide...
Страница 10: ...viii BladeCenter Type 8677 Planning and Installation Guide...
Страница 94: ...84 BladeCenter Type 8677 Planning and Installation Guide...
Страница 122: ...112 BladeCenter Type 8677 Planning and Installation Guide...
Страница 125: ......
Страница 126: ...Printed in USA GA27 4327 01...