b. Place the battery carrier in the battery mounting slot on the microprocessor 2 air baffle and
ensure that battery carrier posts align with the rings on the battery mounting slot so that the
battery carrier is secure in the slot.
Note:
The positioning of the remote battery depends on the type of remote battery that you
install. The long edge of the battery might fit the recessed rings either parallel or perpendicular
to the front bezel.
Microprocessor 2
air baffle
Battery
Posts
Posts
Battery
retention clip
Battery
mounting
slots
Rings
Figure 70. Battery installation
c. Take the battery retention clip and place it underneath the other tab while pressing release tab
toward the front of the server; then, press it down until it snaps in place to hold the battery
carrier firmly in place.
If you have other devices to install or remove, do so now. Otherwise, go to
“Completing the installation” on
.
Installing the DVD enablement kit
Use this information to install the DVD enablement kit.
The Lenovo System x3550 M3 DVD enablement kit is used to install an optical drive cage in a server with less
than four hard disk drives. The optional optical drive cage is installed in the bays for hot-swap hard disk
drives 5 to 8.
The DVD enablement option kit contains the following components:
• One optical drive cage
• One optical drive bay filler panel
• One SATA cable
• One retention bracket
• One bezel and screws
.
89
Содержание 7944
Страница 1: ...System x3550 M3 Installation and User s Guide Machine Type 4254 and 7944...
Страница 44: ...Figure 14 Server components 34 System x3550 M3Installation and User s Guide...
Страница 114: ...104 System x3550 M3Installation and User s Guide...
Страница 132: ...122 System x3550 M3Installation and User s Guide...
Страница 136: ...126 System x3550 M3Installation and User s Guide...
Страница 148: ...138 System x3550 M3Installation and User s Guide...
Страница 149: ......
Страница 150: ...Part Number 00KC032 Printed in China 1P P N 00KC032 1P00KC032...