Removals
Overview
Installation procedure assumption
Assume that the installation procedure for a FRU is the reverse of the removal procedure. Any differences
will be described under “Installation notes” for that FRU.
Paper path nomenclature
Base tractor (rear tractor when a second tractor is installed): This tractor is installed at the factory on all
machines. In a single tractor machine the base tractor is the front tractor. The base tractor becomes the (
rear
tractor when a second (optional) tractor is installed.
Second tractor (optional, becomes front tractor): This tractor can be installed in front of the base tractor as an
option. In a two tractor machine the second (optional) tractor is the
front tractor and the base tractor becomes the
rear tractor.
Covers
Rear cover and top cover asm.
Rear cover:
DANGER
<1-13> Do not connect or disconnect a communication port, a teleport, or any other connector during an
electrical storm.
Chapter 5. Removals, service checks and adjustments
192
Содержание 4247-V03
Страница 24: ...Reference table 8 ribbon lift and 26 pin cable connectors 93 Chapter 1 Diagnosing problems 24 ...
Страница 138: ...Operator panel cable wiring Chapter 3 Wiring diagrams 138 ...
Страница 144: ...Tractor assembly cable wiring Chapter 3 Wiring diagrams 144 ...
Страница 164: ...Chapter 5 Removals service checks and adjustments 164 ...
Страница 173: ...Table 24 Print quality sample 1 2 3 Chapter 5 Removals service checks and adjustments 173 ...
Страница 246: ...Assemblies Chapter 6 Parts catalog 246 ...
Страница 307: ...Taiwanese EMC Notices 307 ...
Страница 310: ...Index Copyright IBM Corp 2002 310 ...
Страница 311: ...IBMR Part Number 75P1301 Printed in U S A G544 5873 00 1P P N 75P1301 ...