3746-900 preparing for installation
Special Tools/Test Equipment
A cover lock key P/N 1643894 shipped with the 3746-900.
Note: Not required but preferred for unpacking if available from branch office:
A power screwdriver
A 3/8" socket set
Installation Time
The estimated hardware installation time is 6.0 hours.
The average time for installing the external cables is 1.0 hour.
The estimated 3745 interruption time is 3.0 hours.
The estimated installation time for a ethernet bridge is: 1.0 hour.
The estimated installation time for a multiaccess enclosure is: 2.45 hours.
Note: The 3746-900 installation and test procedure (part one) can be performed
while the 3745 is running .
Note
Under the installation service code, only report the time spent on the proce-
dures described in this manual. Other activities must be reported on another
service code according to your general reporting instruction guide.
Making Ready to Install
(Place a check mark next to each completed step.)
Step
1. ____ Connect to the following web site
http://www.lagaude.ibm.com/3746pe, and download all mandatory fixes
according to the level of the code that you are going to install.
Step
2. ____ Ensure that the RSF link is installed and working.
Note: If the customer has not provided an RSF link, review or have mar-
keting review the maintenance exposure with the customer.
Step
3. ____ Starting with 3746-900 microcode EC D46100, the 3746-900 should
be registered in RETAIN in addition to the 3745-XXA.
Insure that both the 3745 and 3746 types and models are registered in
RETAIN (CCPF).
For U.S.A. machines, please call the Raleigh Multiplexor Support Center
and verify your machine's registration in CCPF for:
a. The seven digit serial number of the 3745/3746 is correct.
b. The three digit model designation for the 3745/3746 is correct.
Step
4. ____ Check all items listed on the shipping group bill of material (B/M).
Verify that all parts have been received.
Step
5. ____ Make sure that all the cables specified on the cable order form have
been received. Report any difference to the IBM sales representative and
to the CE branch office.
Step
6. ____ Verify that the service processor access unit (8228) is available to
connect the 3746-900.
Chapter 1. Preparing for Installation
1-11
Содержание 3746-900
Страница 1: ...3746 Nways Multiprotocol Controller Model 900 IBM Installation Guide SY33 2114 03...
Страница 2: ......
Страница 3: ...3746 Nways Multiprotocol Controller Model 900 IBM Installation Guide SY33 2114 03...
Страница 14: ...xii 3746 900 Installation Guide...
Страница 17: ...Notices xv...
Страница 20: ...7 Power ON indicator 8 Emergency power OFF xviii 3746 900 Installation Guide...
Страница 24: ...xxii 3746 900 Installation Guide...
Страница 26: ...xxiv 3746 900 Installation Guide...
Страница 40: ...3746 900 preparing for installation 1 14 3746 900 Installation Guide...
Страница 102: ...3746 900 Test Procedure 3 14 3746 900 Installation Guide...
Страница 146: ...Cabling the 3746 900 to the 3745 X1A 4 44 3746 900 Installation Guide...
Страница 168: ...3745 Test Procedures 7 6 3746 900 Installation Guide...
Страница 198: ...3746 900 Ground Bracket Installation 9 6 3746 900 Installation Guide...
Страница 204: ...3746 900 Attached to a 3745 17A Ground Bracket Installation 10 6 3746 900 Installation Guide...
Страница 205: ...Machine Ready for Customer Chapter 11 Making the Machine Ready for the Customer Copyright IBM Corp 1996 1997 11 1...
Страница 210: ...Machine Ready for Customer 11 6 3746 900 Installation Guide...
Страница 218: ...Removal the 3746 900 Attached to a 3745 17A 13 4 3746 900 Installation Guide...
Страница 220: ...A 2 3746 900 Installation Guide...
Страница 250: ...E 14 3746 900 Installation Guide...
Страница 268: ...X 18 3746 900 Installation Guide...
Страница 272: ......
Страница 275: ......
Страница 276: ...IBM Part Number 29H4858 Printed in Denmark by IBM Danmark A S 29H4858 SY33 2114 3...