- 23 -
14. CHECKS
-
Adjust the belt and cable control tension after the first few working hours to compensate
initial loosening.
-
Briefly operate all the machine's components to detect any abnormal noises or
overheating.
-
During the initial running in period avoid heavy-duty usage to encourage proper settling
of the mechanical parts.
-
Never neglect maintenance operations after work and carry out all prescribed checks
regularly.
A) TYRE PRESSURE :
Regularly check the tyre pressure. If both two tyres are not inflated to average pressure the
machine will tend to travel sideways during operation.
Tyre pressure : 27 Psi
1.9 Bar
WARNING
ANY COMPLEX JOB AND ANY WORK AFFECTING THE SAFETY OF THE
OPERATOR AND/OR OTHER PERSONS MAY ONLY BE CARRIED OUT AT AN
AUTHORISED SERVICE CENTRE
Содержание IB 642 HD
Страница 1: ...Safety and operation instruction IB 842 HD IB 642 HD IB 942 HD...
Страница 2: ...2...
Страница 11: ...11 Figure 2 Figure 1...
Страница 27: ...27 Figure 6 Figure 7...
Страница 43: ...43...