![background image](http://html1.mh-extra.com/html/ibc-water/ast1041tc-cl/ast1041tc-cl_installation-and-operating-instructions-manual_3240021016.webp)
AS1041TC-CL
Page
16
water is supplied to the plumbing system. (Figure
2)
3.
Diagnostic Position
: The inlet handle points in
the direction of flow and the outlet handle points
to the centre of bypass valve, system water
pressure is allowed to the control valve and the
plumbing system while not allowing water to exit
from the control valve to the plumbing.(Figure 3)
4.
Shut Off Position:
The inlet handle points to the
centre of the bypass valve and the outlet handle
points in the direction of flow, the water is shut off
to the plumbing system (i.e. plumbing connection
somewhere in the building bypasses the system).
(Figure 4)
Содержание AST1041TC-CL
Страница 3: ...AS1041TC CL Page 3...
Страница 7: ...AS1041TC CL Page 7 Note Maximum number of days that can be selected is 99...
Страница 23: ...AS1041TC CL Page 23 SPARE PARTS AND SERVICING INSTRUCTIONS...
Страница 31: ...AS1041TC CL Page 31 10 V3156 O ring 214 2 Flow Diagrams Service and Backwash flow diagram service...
Страница 32: ...AS1041TC CL Page 32 flow diagram backwash Flow Diagram Down flow Brine...
Страница 33: ...AS1041TC CL Page 33 flow diagram downflow brine Flow Diagrams Rinse and Fill...
Страница 34: ...AS1041TC CL Page 34 flow diagram rinse flow diagram fill WS1 Wrench Order No V3193 01...
Страница 41: ...AS1041TC CL Page 41...
Страница 42: ...AS1041TC CL Page 42 Troubleshooting...