AS1041TC-CL
Page
8
The WS1-TC has been factory programmed with the majority of the commands and parameters installed. It is
necessary on commissioning of the softener to program in the “DAYS between regenerations as calculated on
page 5 and if desired another
time of
day
when regeneration is to proceed or accept the
factory default of
2am
and to set up the clock to register the
current time
of day. The supplied transformer plugs into the back
socket mounted on the back face of the front panel of the valve .
The procedure is as follows :
Plug in the transformer into the mains and turn on – valve will sequence to the service position
.
CUSTOMER/ INSTALLER
PROGRAMING INSTRUCTIONS
Setting Time and Period Between
Regenerations.
Step 1ID
– To enter installer display press the
SET
HOUR
and
▲
buttons
simultaneously
for
approximately 5 seconds and release when “
2”
flashes
. This is the factory programmed Time Of
Regeneration at 2 am. If this default time needs to be
changed proceed as
2ID
. If acceptable press
SET
HOUR button
and go to
3ID.
Step 2ID
– Using the
keys
input desired Time
Of Regeneration.
Note the clock is a 24 hour display
and
only hours not minutes
can be programmed
in. Press
SET HOUR
to go to Step
3ID
Step 3ID
– Days between regeneration
Use or buttons to Set the days between
regeneration as calculated on page 5.
Press
SET HOUR
to exit.
Setting Current Time of Day
Step 1U:
Push
SET HOUR
button .
TIME -HOUR
screen will
Flash.
Step 2U:
Set the display to the closest HOUR by using the
buttons. Note the display is a 24 hour clock.
Press
SET HOUR
button to exit.
After a power outage, the current Time Of Day will
have to be reset
Содержание AST1041TC-CL
Страница 3: ...AS1041TC CL Page 3...
Страница 7: ...AS1041TC CL Page 7 Note Maximum number of days that can be selected is 99...
Страница 23: ...AS1041TC CL Page 23 SPARE PARTS AND SERVICING INSTRUCTIONS...
Страница 31: ...AS1041TC CL Page 31 10 V3156 O ring 214 2 Flow Diagrams Service and Backwash flow diagram service...
Страница 32: ...AS1041TC CL Page 32 flow diagram backwash Flow Diagram Down flow Brine...
Страница 33: ...AS1041TC CL Page 33 flow diagram downflow brine Flow Diagrams Rinse and Fill...
Страница 34: ...AS1041TC CL Page 34 flow diagram rinse flow diagram fill WS1 Wrench Order No V3193 01...
Страница 41: ...AS1041TC CL Page 41...
Страница 42: ...AS1041TC CL Page 42 Troubleshooting...