13. Maintenance and Inspection..................................................................................... 68
13.1
Inspection Items and Periods............................................................................................ 68
70
13.2.1
Applicable Grase and Supply Period.......................................................................70
13.2.2
Grease Supply ........................................................................................................ 71
13.2
Battery Replacement .........................................................................................................70
13.2.1
Preparation ..............................................................................................................70
13.2.2
Replacement Procedure ..........................................................................................71
13.3
Check for Looseness of Arm Attachment Screws ............................................................72
13.4.1
Preparation ..............................................................................................................73
13.4.2
Replacement Procedure ......................................................................................... 74
13.2
Ball Screw Spline Grease Supply .....................................................................................
13.4
Replacement of Absolute Backup Battery ........................................................................73
13.5
Third Axis Timing Belt Visual Check ................................................................................. 76
13.6
How to Measure Lost Motion ............................................................................................ 77
13.8
Absolute Encoder Reset Method.......................................................................................80
13.8.1
Preparation for Absolute Reset ...............................................................................80
13.8.2
Starting the Absolute Reset Menu...........................................................................81
13.8.3
Absolute Reset Procedure for Arm 1 or 2................................................................82
13.8.4
Absolute Reset Procedure for the Rotational Axis + Vertical Axis ..........................87
14. Warranty Period and Scope of Warranty ................................................................. 95
Change History .............................................................................................................. 97
95
95
95
95
96
96
14.1 Warranty Period ..................................................................................................................
14.2
Scope of Warranty...............................................................................................................
14.3
Honoring the Warranty........................................................................................................
14.5
Conditions of Conformance with Applicable Standards/Regulations, Etc.,
and Applications..................................................................................................................
14.6 Other Items Excluded from Warranty......................................................................................
14.4
Limited Liabil .......................................................................................................................
13.7
Forth Axis Timing Belt Visual Check ................................................................................. 79
Содержание IX Series
Страница 2: ......
Страница 4: ......
Страница 56: ...50 9 How to Install ...
Страница 58: ...52 9 How to Install Center of recommended installation part ...
Страница 95: ...89 13 Maintenance and Inspection 6 Click the Servo OFF button Servo OFF 7 Press the emergency stop switch ...
Страница 104: ......
Страница 105: ......