6-69-27
TEST PROCEDURE
Test 18: Check voltage between connector
CN-88 (2) - GND.
Disconnect connector CN-88 from power
max solenoid valve.
Start switch ON.
Check voltage as figure.
(1)
刮
刯
到
2)
Test 19: Check resistance of the solenoid
valve between CN-88 (1)-(2).
Starting switch OFF.
Disconnect connector CN-88 from power
max solenoid valve.
Check resistance as figure.
(2)
刮
刯
到
LH RCV-lever
Power max switch
Power max
solenoid valve
CN-88
Multimeter
1
2
1
2
140L6MS124
LH RCV-lever
Power max switch
Power max
solenoid valve
Multimeter
Ground
CN-88
1
2
1
2
SPEC : Starting switch ON : 24
佳
1V
Starting switch OFF : 0V
SPEC : 15~35
凂
140L6MS123
(SERIAL NO. : #0611-)
Содержание HX140L
Страница 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 209: ...4 5 MEMORANDUM...
Страница 275: ...4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 675: ...8 58 29 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 703: ...8 77 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Страница 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 767: ...8 141 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...