5-84
Contact (A/S phone number)
刲
Machine Information
刱
This can confirm the identification of the model information (ECU), MCU, monitor, haptic
controller, switch controller, RMCU, relay driver unit, FATC (air conditioner controller), AAVM
(opt).
余
Enter the new A/S phone number
290F3CD144
290F3CD145
290F3CD146
290F3CD147
290F3CD148
290F3CD149
290F3CD250
290F3CD151
Service menu
刳
Power shift (standard/option) : Power shift pressure can be set by option menu.
Operating hours : Operating hours since the machine line out can be checked by this menu.
Breaker mode pump acting (1 pump/2 pump)
EPPR current level (attach fl ow EPPR 1 & 2, boom priority EPPR, attach relief pressure EPPR
1& 2)
Overload pressure : 100 ~ 350 bar
余
余
余
余
余
290F3CD152
290F3CD153
Clinometer
刴#
When the machine is on the fl atland, if tap the "initialization", the values of X, Y reset "0".
You can confi rm tilt of machine in cluster's operating screen.
余
余
Содержание HX140L
Страница 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 209: ...4 5 MEMORANDUM...
Страница 275: ...4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 675: ...8 58 29 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 703: ...8 77 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Страница 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 767: ...8 141 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...