6-56
TEST PROCEDURE
Test 13 : Check voltage at CN-52 (17)
and ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Inser t prepared pin to rear side of
connectors : One pin to (17) of CN-52.
Starting switch ON.
Check voltage as figure.
MCU
CN-51
CN-52
Female
CN-52
1
2
3
4
5
6
7
8
9
10
31
32
33
34
36
37
38
39
40
11
21
20
30
Multimeter
GROUND
PIN
17
(1)
刮
刯
到
刱
2)
SPEC : Actuator operating : 1~5 V
300L6MS14
(SERIAL NO. : -#0610)
Содержание HX140L
Страница 12: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Страница 209: ...4 5 MEMORANDUM...
Страница 275: ...4 49 No of pin Receptacle connector female Plug connector male 14 1 7 6 14 MG610406 KET SDL CONNECTOR 13...
Страница 675: ...8 58 29 Insert O rings to the relief valve 30 and reassemble them to rear cover 20 This completes assembly 17 32038SM42...
Страница 694: ...8 68 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Страница 703: ...8 77 125LCR8TM61 After assembling spring 44 in order clamp plug 41 Tightening torque 5 kgf m 36 lbf ft 31...
Страница 734: ...8 108 Assemble plug 2 Plug NPT1 16 11 EA 17 21078TM68 21078TM69 21078TM70 21078TM71...
Страница 756: ...8 130 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...
Страница 767: ...8 141 14 15 3 Install cover 3 to body 1 and tighten bolts 14 Torque 10 12 5 kgf m 72 3 90 4 lbf ft 7 21078DA10...