8-15
3 stage mast(TF mast)
Remove the carriage assembly and
move to one side.
Loosen and remove hexagon bolt
securing bottom cylinder from outer mast.
Loosen and remove bolts and special
washers securing lift cylinders to middle
mast.
Attach chains or sling to the inner and
middle mast section at top crossmember.
Using an overhead hoist, slowly raise the
uprights high enough to clear lift cylinder.
After lowering the lift cylinder rods, and
disconnecting lift cylinder hose, tilt the lift
cylinders LH and RH and tie them with
ropes to the outer mast.
Using the overhead hoist raise inner and
middle masts. Place 4 inch block of
wood under the free lift cylinder bracket of
the inner mast then lower mast sections
(this will create slack in the chains).
Remove retaining rings securing chain
sheaves to sheave support brackets.
While support chains, remove chain
sheaves and let chains hang free. The
upper outer and lower middle mast rollers
and back up liners are now exposed.
Using a pryer, remove load rollers from
load bracket. Remove back up liners and
shims.
Attach chains or sling to the middle mast
section at top crossmember. Using an
overhead hoist, slowly raise the middle
mast until top and bottom rollers are
exposed.
Using a player, remove load rollers from
load roller bracket.
Thoroughly clean, inspect and replace all
worn or damaged parts.
Reverse the above procedure to
assemble. Refer to MAST LOAD
ROLLER ADJUSTMENT paragraph.
(3)
20D7MS15
Содержание 20G-7
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 6: ......
Страница 17: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 14 ...
Страница 33: ...SECTION 2 REMOVAL AND INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and Installation of Unit 2 2 ...
Страница 41: ...2 7 Mast Refer to the chapter 1 MAST Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 59: ...3 7 OPERATING MODES Forward INPUT OUTPUT 4 1 INPUT OUTPUT 20D7PT29 20D7PT30 Reverse 2 ...
Страница 231: ...7 3 FUEL SYSTEM CIRCUIT TIER 3 LPG 20L7EL07 ...
Страница 232: ...7 4 FUEL SYSTEM CIRCUIT TIER 3 BI FUEL 20L7EL06 ...
Страница 233: ...7 5 FUEL SYSTEM CIRCUIT NON CERT LPG 20L7EL08 ...
Страница 234: ...7 6 FUEL SYSTEM CIRCUIT NON CERT BI FUEL 20L7EL09 ...
Страница 235: ...7 7 MEMORANDUM ...
Страница 267: ...MODEL L4GC SHOP MANUAL FOR INDUSTRIAL USE ...
Страница 270: ...CONTENTS 4 FUELSYSTEM 4 1 3 ENGINEELECTRICALSYSTEM 3 1 2 ENGINE MECHANICAL SYSTEM 2 1 1 GENERAL 1 1 ...
Страница 271: ...1 GENERAL 1 1 2 RECOMMENDEDLUBRICANTSANDCAPACITIES 1 5 3 SCHEDULEDMAINTENANCE 1 6 CHAPTER 1 GENERAL ...
Страница 284: ...GENERAL 2 1 GENERAL OUTLINE L4GC001A ...
Страница 285: ...GENERAL 2 2 L4GC002A ...
Страница 305: ...CYLINDER BLOCK 2 22 INSTALLATION Install the following parts in order 1 Crankshaft 2 Flywheel 3 Piston 4 Cylinder head ...
Страница 311: ...CYLINDER BLOCK 2 28 Oil pan bolt 1 0 1 2kg m 7 Install the oil pan and tighten the bolt to the specified torque ...
Страница 346: ...LUBRICATION SYSTEM 2 63 4 Front case Oil pump 5 Timing belt 6 Timing belt cover ...
Страница 369: ...1 GENERAL 3 1 2 IGNITIONSYSTEM 3 3 3 CHARGINGSYSTEM 3 9 4 STARTINGSYSTEM 3 25 CHAPTER 3 ENGINE ELECTRICAL SYSTEM ...
Страница 390: ...3 21 5 Loosen 4 through bolts L4GC330A L4GC048A 6 Separate the rotor and cover CHARGINGSYSTEM ...
Страница 402: ...1 GENERAL 4 1 2 INJECTOR 4 14 4 PVC VALVE 4 16 CHAPTER 4 FULE SYSTEM AND OTHER ...
Страница 420: ......