8-5
GROUP 2 OPERATIONAL CHECKS AND TROUBLESHOOTING
1. OPERATIONAL CHECKS
FORKS
Measure thickness of root of forks and
check that it is more than specified value.
EX :
=1050mm(41.3in)
1
1)
(1)
Thickness
Difference in height
at tip of forks
Set forks in middle and measure
difference in height at top of forks.
(2)
STD Fork assy Applicable model
20L(C)/25L(C)-7
20G(C)/25G(C)-7
F173796-02
64FG-31020
Standard
45(1.8)
45(1.8)
Limit
40(1.6)
40(1.6)
mm(in)
Most force is concentrated at root of fork
and at hook, so use crack detection
method to check cracks.
(3)
2. MAST
Check for cracks at mast stay, tilt cylinder bracket, guide bar, fork carriage and roller shaft weld.
Check visually or use crack detection method. Repair any abnormality.
Set mast vertical, raise forks about 10cm from ground and check front-to-rear clearance and left-to-
right clearance between inner mast and fork carriage, and between outer mast and inner mast.
Use these figures to judge if there is any play at roller or rail.
·
Front-to-rear clearance : Within 2.0mm(0.08in)
·
Left-to-right clearance : Within 2.5mm (0.10in)
Check that there is an oil groove in bushing at mast support.
Set mast vertical, raise forks about 10cm from ground, and push center of lift chain with finger to
check for difference in tension.
If there is any difference in tension, adjust chain stopper bolt.
Check visually for abnormalities at thread of chain anchor bolt, and at contact surface between
chain wheel and chain.
Rotate chain wheel by hand and check for any play of bearing.
1)
2)
3)
4)
5)
D507FK01
D255FK02
30L(C)-7, 30G(C)-7
30L(C)-7 30G(C)-7
900~1800
900~1150
1150~1800
3
3
6
Model
Fork length
(mm)
Height
difference(mm)
20L(C)/25L(C)-7
20G(C)/25G(C)-7
Содержание 20G-7
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 6: ......
Страница 17: ...SECTION 1 GENERAL Group 1 Safety hints 1 1 Group 2 Specifications 1 5 Group 3 Periodic replacement 1 14 ...
Страница 33: ...SECTION 2 REMOVAL AND INSTALLATION OF UNIT Group 1 Structure 2 1 Group 2 Removal and Installation of Unit 2 2 ...
Страница 41: ...2 7 Mast Refer to the chapter 1 MAST Page 2 2 1 2 POWER TRAIN ASSEMBLY REMOVAL 1 D503RE04 ...
Страница 59: ...3 7 OPERATING MODES Forward INPUT OUTPUT 4 1 INPUT OUTPUT 20D7PT29 20D7PT30 Reverse 2 ...
Страница 231: ...7 3 FUEL SYSTEM CIRCUIT TIER 3 LPG 20L7EL07 ...
Страница 232: ...7 4 FUEL SYSTEM CIRCUIT TIER 3 BI FUEL 20L7EL06 ...
Страница 233: ...7 5 FUEL SYSTEM CIRCUIT NON CERT LPG 20L7EL08 ...
Страница 234: ...7 6 FUEL SYSTEM CIRCUIT NON CERT BI FUEL 20L7EL09 ...
Страница 235: ...7 7 MEMORANDUM ...
Страница 267: ...MODEL L4GC SHOP MANUAL FOR INDUSTRIAL USE ...
Страница 270: ...CONTENTS 4 FUELSYSTEM 4 1 3 ENGINEELECTRICALSYSTEM 3 1 2 ENGINE MECHANICAL SYSTEM 2 1 1 GENERAL 1 1 ...
Страница 271: ...1 GENERAL 1 1 2 RECOMMENDEDLUBRICANTSANDCAPACITIES 1 5 3 SCHEDULEDMAINTENANCE 1 6 CHAPTER 1 GENERAL ...
Страница 284: ...GENERAL 2 1 GENERAL OUTLINE L4GC001A ...
Страница 285: ...GENERAL 2 2 L4GC002A ...
Страница 305: ...CYLINDER BLOCK 2 22 INSTALLATION Install the following parts in order 1 Crankshaft 2 Flywheel 3 Piston 4 Cylinder head ...
Страница 311: ...CYLINDER BLOCK 2 28 Oil pan bolt 1 0 1 2kg m 7 Install the oil pan and tighten the bolt to the specified torque ...
Страница 346: ...LUBRICATION SYSTEM 2 63 4 Front case Oil pump 5 Timing belt 6 Timing belt cover ...
Страница 369: ...1 GENERAL 3 1 2 IGNITIONSYSTEM 3 3 3 CHARGINGSYSTEM 3 9 4 STARTINGSYSTEM 3 25 CHAPTER 3 ENGINE ELECTRICAL SYSTEM ...
Страница 390: ...3 21 5 Loosen 4 through bolts L4GC330A L4GC048A 6 Separate the rotor and cover CHARGINGSYSTEM ...
Страница 402: ...1 GENERAL 4 1 2 INJECTOR 4 14 4 PVC VALVE 4 16 CHAPTER 4 FULE SYSTEM AND OTHER ...
Страница 420: ......