www.hytekintl.com
SERVICE MANUAL
GENERAL FEATURES
V132 valves are the essential elements in
b u i l d i n g t h e f o l l o w i n g s y s t e m s :
a) simplex, duplex or multi-tank softening
(decalcification) systems for domestic,
laboratory and industrial use;
b) simplex or duplex demineralisation and
dealkalisation systems for laboratory and
industrial use and all other uses requiring
water with characteristics of guaranteed
quality;
c) simplex or duplex filtering systems for
all of the previous applications.
The valves are made with materials that
guarantee utmost resistance and quality.
They are available with a vast range of
controllers for every operation phase of
service and regeneration, starting from
the simplest electronic basic controller
with weekly clock to the sophisticated
electronic controllers in various models
which enable volume, volume-time
c o n t r o l a n d s a l i n i t y c o n t r o l i n
MicroSiemens/cm, etc.
In the electronic systems, all the
intervention times of operation phases
can be programmed in relation to system
type and dimension.
For specific controller features, see the
relative controller section.
S O F T E N I N G V E R S I O N S S C H E M E S
- A) Duplex softening scheme with two
brine measure valves, slow rinse, 3V
output valve. 5 pilot valve controller:
- B)
Duplex softening scheme with brine
m e a s u r e v a l v e , s l o w r i n s e a n d
automatic/dynamic device to determine
brine-draw line. 5 pilot valve controller.
3V valve:
- C) Duplex softening scheme without
slow rinse, (salt-brine container fed
separately), without brine-measure valve.
5 pilot valve controller. 3V valve:
- E) Duplex softening scheme with slow
rinse (Salt/brine container fed separately)
without brine-measure valve. 7 pilot valve
controller. 3V valve:
Duplex softening connections referring
to schemes “E”.
Duplex softening connections referring
to schemes “G”.
Deionisation connections referring to
schemes “H”.
Deionization connections referring to
schemes “I” .
PROJECTION TUBE PILOT
- F) Duplex softening scheme without slow
rinse (Salt/brine container fed separately)
Two output valves "A" and "B". 5 pilot
valve controller. Without brine measure
valve:
- G) Duplex softening scheme with slow
rinse (Salt/brine container fed separately)
Two output valves "A" and "B". 7 pilot
valve controller. Without brine measure
valve:
- H) Demineralisation scheme without
valves for slow rinse, 5 pilot valve
c o n t r o l l e r. A t t e n t i o n ! D i s s u a d e d
application:
- I) Demineralisation scheme with valves
f o r s l o w r i n s e , 7 p i l o t v a l v e
c o n t r o l l e r. A t t e n t i o n ! A p p l i c a t i o n
Recommended:
Duplex softening connections referring
to schemes “A”, “B”, “C”
.
Duplex softening connections referring
to schemes “F”.
Maximum projection 20 mm
Minimum projection 15 mm
Cut off tub tip
max 1 mm
V132
Siata
198
Содержание Siata 3V-50
Страница 1: ...VALVOLE SIATA 5 SIATA VALVES ...
Страница 2: ......
Страница 7: ...w w w h y t e k i n t l c o m i n f o h y t e k i n t l c o m DIMENSIONI DIMENSIONS V132 Siata 199 ...
Страница 31: ...w w w h y t e k i n t l c o m i n f o h y t e k i n t l c o m DIMENSIONI DIMENSIONS V230 Siata 223 ...
Страница 44: ...w w w h y t e k i n t l c o m i n f o h y t e k i n t l c o m DIMENSIONI DIMENSIONS V250 Siata 236 ...
Страница 59: ...w w w h y t e k i n t l c o m i n f o h y t e k i n t l c o m DIMENSIONI DIMENSIONS V260 Siata 251 ...
Страница 74: ...w w w h y t e k i n t l c o m i n f o h y t e k i n t l c o m DIMENSIONI DIMENSIONS V360 Siata 266 ...