4. Operation
NEXIA-SY Series User Manual 89
(3) Example
Stacking a product to locate to 300 mm for Traverse Axis and 200 mm Kick Axis for each
cycle. ( 2 x 2 )
2
Mold: W1
RelPos
Speed
80
DlyTime
0.4 Sec
RelDly
0.5 Sec
Current Memory
Trvs
1700.0 1700.0
PFwBw
500.0
500.0
PAscDsc
1100.0 1100.0
Rot
ON ON
S지
OFF OFF
RFwBw
RAscDsc
Swl
10%
STEP 1
Press
to set up detail stacking.
2
Mold: W1
Detail
Pos1
Pos2
Pos3
Pos4
Pitch
Times
FwBw
Trvs
MainPos
AscDsc
-
-
-
-
-
-
CLEAR
SubPos
DlyTime
0.0
AscHeight
0.0
FwBwDis
0.0
TrvsDis
0.0
Speed
30
STEP 2
① Input 300 in Pitch of Trvs
② Input 2 in Time of Trvs
③ Input 200 in Pitch of FwBw
④ Input 2 in Times of FwBw.
2
Mold: W1
Detail
Pos1
Pos2
Pos3
Pos4
Pitch
Times
FwBw
Trvs
MainPos
AscDsc
300.0
200.0
-
2
2
-
CLEAR
SubPos
DlyTime
0.0
AscHeight
0.0
FwBwDis
0.0
TrvsDis
0.0
Speed
30
STEP 3
Press
to close and save.
Up
Kick
200mm
300m
Traverse
Product
1
2
3
4
Содержание NEXIA-SY Series
Страница 2: ......
Страница 14: ...xii...
Страница 18: ......
Страница 19: ...1 Introduction...
Страница 20: ......
Страница 25: ...2 Before Operation...
Страница 26: ......
Страница 30: ...2 Before Operation 12 NEXIA SY Series User Manual...
Страница 31: ...3 START UP STOP...
Страница 32: ......
Страница 37: ...3 Start up Stop NEXIA SY Series User Manual 19 STEP 4 Turn Off Power STEP 5 Disconnect Air Pressure...
Страница 41: ...4 OPERATION...
Страница 42: ......
Страница 134: ......
Страница 135: ...5 Follow up...
Страница 136: ......
Страница 157: ...6 Error...
Страница 158: ......
Страница 163: ...Appendix...
Страница 164: ......
Страница 187: ......
Страница 196: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ......
Страница 202: ......