4. Operation
54 NEXIA-SY Series User Manual
(3) Example
1
Mold: COCK
MoldFile
NO Mold
1 COCK
1 COCK
STEP 1
Press
go to EOAT change move screen.
P r e s s S t a r t t o m o v e
t o E O A T p o s i t i o n
2
Mold: REZZO1
EOATChg
10%
v
STEP 2
Press
, robot arm will move.
Moved to jig change position .
After finishing work , pressing start button
Moves to origin .
2
Mold: REZZO1
EOATChg
10%
STEP 3
Press
, robot arm will move to EOAT
change position.
Содержание NEXIA-SY Series
Страница 2: ......
Страница 14: ...xii...
Страница 18: ......
Страница 19: ...1 Introduction...
Страница 20: ......
Страница 25: ...2 Before Operation...
Страница 26: ......
Страница 30: ...2 Before Operation 12 NEXIA SY Series User Manual...
Страница 31: ...3 START UP STOP...
Страница 32: ......
Страница 37: ...3 Start up Stop NEXIA SY Series User Manual 19 STEP 4 Turn Off Power STEP 5 Disconnect Air Pressure...
Страница 41: ...4 OPERATION...
Страница 42: ......
Страница 134: ......
Страница 135: ...5 Follow up...
Страница 136: ......
Страница 157: ...6 Error...
Страница 158: ......
Страница 163: ...Appendix...
Страница 164: ......
Страница 187: ......
Страница 196: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ......
Страница 202: ......