SETUP
3-8
powermax
1650
Operator Manual
2
Torch installation
1. Turn OFF the power.
2. Remove the power cord from the power receptacle.
3. Open the Easy Torch Removal (ETR) door and route the lead through the end cap.
_
+
4.0
5.0
50
60
AC
70
80
V
BAR
6.0
PSI
AMPS
30
40
100
80
60
OFF
ON
ETR door
End cap
Содержание powermax1650
Страница 10: ...WARRANTY vi Hypertherm ...
Страница 14: ...TABLE OF CONTENTS 0 x powermax1650 Operator Manual ...
Страница 26: ...1 12 Hypertherm 11 08 SAFETY ...
Страница 38: ...11 08 1a 12 Hypertherm SÉCURITÉ ...
Страница 50: ...11 08 SEGURIDAD 1b 12 Hypertherm ...
Страница 106: ...MAINTENANCE AND PARTS 0 5 12 powermax1650 Operator Manual ...